DCM Community NOC for a New Villa on a Meraas Plot

On the Meraas plots, DCM (Dubai Holding Community Management) is the master developer. Its community NOC on your villa design is the first approval after the plot rules.

The DCM community NOC is the master developer's approval of your villa design on a Meraas plot. DCM checks the drawings against the plot rules it issued with the affection plan: the floors, height, setbacks, coverage and floor area, and the look of the elevations. Only with this NOC can the design go to Civil Defence and then to DDA for the building permit. Meraas developed the plots but does not issue this NOC. We prepare the drawings and submit them to DCM for you.

Issued byDCM
ChecksDesign against plot rules
BeforeCivil Defence and DDA

What DCM reviews

The design check

ItemChecked against
Floors and heightPlot rules
Setbacks and coveragePlot rules
Floor areaPlot rules
Elevations and materialsCommunity character
Site plan, access and servicesCommunity layout

Later DCM NOCs

What DCM issues after the design

NOCPage
Site hoarding, access, night worksthe site set-up NOCs
Sewerage connectionthe sewerage connection
Vehicle access and gate levelvilla access and gate level
Right of way worksthe right of way NOC

Communities

Where this applies

The same step applies on the Meraas plots in Pearl Jumeirah, Naia Island, Jumeirah Bay, La Mer, Al Wasl (Le Hemaira) and Umm Al Sheif.

Official sites: DDA

What you need to know

  • DCM issues it.
  • Plot rules are the test.
  • First design approval.
  • Not Meraas.

Documents you will need

  • Affection plan and plot rules
  • Architectural drawings
  • Site plan
  • Title deed and owner ID

How it works

Getting the DCM NOC

1. Plot rules

From DCM.

2. Design

Within them.

3. Submit

To DCM.

4. Comments

We resolve.

5. NOC

Issued.

6. Next

DCD, DDA.

Questions

DCM NOC: questions

Who issues the design NOC on a Meraas plot?

DCM, the master developer.

Does Meraas issue it?

No. Meraas developed the plots; DCM issues the NOCs.

What happens if DCM comments on the design?

We revise the drawings and resubmit.

What comes next?

Civil Defence approval, then the DDA building permit.

How much does it cost?

Our fee depends on the drawings and the scope; we review your plot and advise. DCM, DDA, Civil Defence and service provider fees are separate, and we list them before you commit.

Who can help?

Structural Solutions handles every DCM, Civil Defence and DDA step for new villas on Meraas plots. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading