Question · Steel drawings · Updated November 2026

Who Can Stamp Steel Drawings in Dubai?

Your steel drawings came back asking for a stamp, or a contractor told you an engineer stamp is not enough. Here is who stamps what on steel works in Dubai, and how to get both stamps without chasing two companies.

Two parties stamp steel works in Dubai. The consultant stamps the structural calculations and drawings. An approved steel contractor (also called a steel specialist) recognised by Dubai Municipality, DDA or Trakhees stamps the steel. A normal engineering stamp alone is usually not accepted for the steel part, and a steel contractor stamp alone does not replace the consultant calculations. We prepare the calculations and coordinate the steel stamp together.

ConsultantStamps calculations and drawings
Steel stampApproved steel contractor
Same asSteel specialist

Who stamps what

Who stamps what on steel drawings

DocumentStamped by
Structural calculationsThe consultant; see engineer-stamped structural calculations
Structural drawings for the permitThe consultant
Steel design and fabrication drawingsAn approved steel contractor (also called a steel specialist) recognised by the authority
Shop drawings from the fabricatorChecked against the design; see steel shop drawing approval
Third-party verificationOnly where the authority asks for it; see third-party verification of steel works

By authority

Steel works approval by authority

The plot location decides the authority. We confirm it before starting.

AuthorityTypical areasSteel stamp
Dubai MunicipalityAl Quoz, Al Qusais, Ras Al Khor, Jumeirah, Al Barsha, Emirates LivingDM approved steel contractor (also called a steel specialist)
DDADubai Hills, Arabian Ranches, Business Bay, TECOM zones, Dubai Industrial CityDDA approved steel contractor (also called a steel specialist); see steel specialist stamp for DDA approval
TrakheesJAFZA, Palm Jumeirah, Jumeirah Park, Al Furjan, JVCTrakhees approved steel contractor (also called a steel specialist); see approved steel contractor

Common problems

Common stamp problems on steel submissions

ProblemWhat fixes it
Only an engineer stamp on the steelAdd the approved steel contractor (also called a steel specialist) stamp
Steel contractor stamp but no calculationsConsultant calculations and drawings
Stamp from a contractor for another authorityA stamp recognised by the right authority for the plot
Shop drawings differ from the designCheck and revise against the calculations

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Two stamps are usual on steel works.
  • Right authority: the steel stamp must be recognised by DM, DDA or Trakhees as the plot requires.
  • Steel specialist = approved steel contractor.
  • One team: see steel calculations and stamp in one team.

Documents you will need

  • The steel drawings
  • Any authority comments
  • Calculations, if any
  • Plot or property details

How it works

How we get steel drawings stamped

1. Send

Drawings and comments.

2. Check

Which stamps are missing.

3. Calculations

Prepared or checked.

4. Steel stamp

Coordinated.

5. Resubmit

Until approval.

Questions

Steel drawing stamp questions

Who can stamp steel drawings in Dubai?

The consultant stamps the calculations and drawings, and an approved steel contractor (also called a steel specialist) recognised by the authority stamps the steel.

Is a structural engineer stamp enough for steel works?

Usually not on its own. The steel part also needs the approved steel contractor stamp.

Can my steel fabricator stamp the drawings?

Only if it is an approved steel contractor recognised by the authority for your plot, and the consultant calculations are still needed.

Can you do the calculations and the steel stamp together?

Yes. We prepare the calculations and coordinate the steel stamp. See steel calculations and stamp in one team.

Does DDA have its own steel stamp?

DDA works need a stamp recognised by DDA. See steel specialist stamp for DDA approval.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares the steel structural calculations and drawings, coordinates the approved steel contractor (also called a steel specialist) stamp and submits to Dubai Municipality, DDA or Trakhees until approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.