DDA · Specialist stamp · Updated November 2026

Strengthening Specialist Stamp for DDA Approval

DDA asks for a separate strengthening specialist stamp on strengthening and repair designs. We coordinate the stamp with the design and the Building Modification submission, so the file goes to DDA complete.

The strengthening specialist stamp is a separate stamp on the strengthening design, in addition to the consultant who submits to DDA. We prepare the design, coordinate the specialist stamp and submit the full package. Contractors and CFRP applicators who need a consultant stamp for their DDA submission can work with us the same way.

StampSeparate, on the design
Coordinated byUs, with the submission
ForOwners and contractors

What is stamped

What the specialist stamp covers

ItemNotes
Strengthening drawingsMethod, extent and details
CalculationsLoads before and after strengthening
Repair method statementSequence, propping and checks
Material dataFrom the contractor or supplier

Contractors

For CFRP and repair contractors

You need a consultant design and stamp for your DDA submission.

You sendWe do
Scope and site photosSite visit and assessment
Your system data sheetsStrengthening design and calculations
Client NOCsSpecialist stamp coordinated, submission to DDA
Your programmeSupervision and close-out

Official sites: DDA | Dubai Building Code

What you need to know

  • Separate stamp from the submitting consultant.
  • Coordinated with the design, not added at the end.
  • Contractors do the works, not the stamp.
  • Steel works have their own steel specialist stamp.

Documents you will need

  • Strengthening scope
  • Existing drawings or survey
  • Test results, if any
  • Contractor system data, if chosen

How it works

How the specialist stamp fits in

1. Scope

What and where.

2. Design

Our engineers.

3. Stamp

Specialist coordinated.

4. Submission

DDA.

5. No Objection

Contractor starts.

Questions

Specialist stamp questions

Is the strengthening specialist stamp required by DDA?

Yes. DDA asks for a separate strengthening specialist stamp on strengthening and repair designs.

Is the concrete restoration stamp a different stamp?

It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp. See concrete restoration stamp.

Can you stamp a design prepared by a contractor?

We review it, revise it where needed and take it through the stamp and submission. See structural peer review.

Is it the same as the steel specialist stamp?

No. Steel works have their own approved steel contractor (also called a steel specialist) stamp. See DDA steel structure approval.

How much does the stamp cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading