Site supervision · Structural · Dubai

Structural Site Supervision in Dubai

The design only works if it is built as drawn.

Structural site supervision means an engineer inspects the works at the key stages: excavation, foundations, reinforcement before each pour, concrete, steelwork and connections. Our engineers check the works against the approved drawings, answer site queries, record each inspection and work with the authority inspections. We act as consultant with DM, DDA and Trakhees.

Structural Site Supervision in Dubai

Official sources: Dubai Municipality

What we check

  • Drawings: Approved set on site
  • Rebar: Before every pour
  • Concrete: Tests and pours
  • Steel: Connections and welds
  • Changes: Site queries and revisions
  • Records: Reports and photos

Documents you will need

  • Building permit and approved drawings
  • Contractor details and programme
  • Structural drawings and calculations
  • Developer NOC, in communities

Route

How it works, step by step

Who does what, from the first check to completion.

StepApproval routeGuides
Appointment
Owner
Appoints us as consultant for the works.—
Approved drawings
Structural Solutions
The approved set goes to site with the contractor.—
Inspections
Our engineers
Key stages: excavation, rebar, concrete, steel and connections.—
Site queries
Our engineers
Answers to contractor questions and design changes where needed.—
Authority inspections
The authority for the area
Inspections at the stages the permit requires.—
Completion
Authority and developer
Completion of the works.—

How it works

How we work

1. Send the project

Permit, drawings and contractor.

2. Scope

Stages and inspections.

3. Inspections

Rebar, concrete, steel.

4. Reports

Photos and comments.

5. Queries

We answer the contractor.

6. Completion

Final inspection.

What causes problems

  • Pouring concrete before the rebar is checked
  • Site changes without the engineer
  • No inspection records at completion

Works starting soon?

Plan the supervision

Send us three things on WhatsApp:

  1. Permit and approved drawings
  2. Contractor and start date
  3. Area and property

Our engineers inspect the key stages, answer site queries and keep the records the authorities ask for.

Questions

Questions

Which stages do you inspect?

Excavation, foundations, rebar before pours, concrete, steel and connections.

Do you write reports?

Yes, with photos and comments.

Who answers contractor questions?

Our engineers, as the consultant.

Which authorities?

We work with DM, DDA and Trakhees.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.