Value Engineering for Industrial Buildings in Dubai
Factories and industrial units: a structural review before you build.
Industrial buildings carry specific loads: equipment, cranes, mezzanines, roof plant and wind. A value engineering review checks whether the structure is sized to these loads, and where the frame, floors and foundations can be simplified within the code. We review, propose options and prepare the updated design for the authority.

Official sources: Dubai Municipality, Dubai Development Authority (DDA), Trakhees
What we check first
- Structure: Steel frame, purlins, bracing
- Loads: Wind, roof, crane, mezzanine
- Code: Design code and authority
- Connections: Bolts, plates, base plates
- Foundations: Reactions and footings
- Approval: Revision if already approved
Documents you will need
- Current structural drawings and calculations
- Architectural layout and building use
- Location and authority (DM, DDA, Trakhees or free zone)
- Steel tonnage or bill of quantities, if available
Route
How it works, step by step
Each project is reviewed first; the route follows the property and the authority.
| Step | Approval route | Guides |
|---|---|---|
| Review Our engineers | The drawings, calculations and the tonnage of the current design. | — |
| Options Structural Solutions | Alternative frames, sections and connections that meet the code. | — |
| Redesign Structural Solutions | Updated drawings and stamped calculations. | — |
| Approval Authority for the area | A revised submission where the design was already approved. | Re-approval |
| Fabrication Your steel contractor | Shop drawings to the approved design. | — |
| Site Contractor | Erection to the approved drawings. | — |
How it works
How it works
1. Send the design
Drawings, calculations, building type.
2. Review
Our engineers check the steel.
3. Options
Where the design can be optimised.
4. Redesign
Drawings and stamped calculations.
5. Approval
Revision where needed.
6. Fabrication
Your contractor builds to it.
Related questions
What causes problems
- Cutting steel without checking the loads
- Changing an approved design without a revision
- Assuming savings before the review
Steel project in Dubai?
Send us the design
Send us three things on WhatsApp:
- Structural drawings or calculations
- Building type and location
- Stage: design, tender or approved
Our engineers review the steel design and tell you where it can be optimised. Savings depend on the project.
Questions
Questions
Which authority approves industrial buildings?
It depends on the area: Dubai Municipality, DDA, Trakhees or the free zone.
Can you review at tender stage?
Yes, that is often the best time.
Does it cover foundations?
Foundation sizes follow the frame reactions, so they are reviewed with the frame.
Do you prepare the new drawings?
Yes, with stamped calculations.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.