Approvals · Delays · Take-over

My Renovation Is on Hold Waiting for Approvals

Contractor ready, materials ordered, but no permit. Here is how to get the file moving.

Works should not start before the developer NOC and the authority permit. If your renovation is on hold, find where the approval stands: still at the developer, at the authority with comments, or waiting for documents. Our engineers review the file, fix what is missing and take it forward, so your contractor can start once the permit is issued.

What we check first

  • File: Application or permit number
  • Status: Where it is stuck
  • Comments: What the authority asked for
  • Drawings: Do they match the site?
  • Developer: NOC issued or pending
  • Next step: Who acts next

Documents you will need

  • Application or permit number
  • The latest comments or rejection notice (screenshot is fine)
  • The drawings submitted so far, if you have them
  • Title deed, or tenancy contract and landlord NOC for shops

Take-over

How we take a delayed approval forward

We review first. You decide whether to move the file to us.

StepApproval routeGuides
Case review
Our engineers
Your application or permit number, the latest comments and the drawings. We see where the file stands and what is holding it.—
Records
You and the current consultant
The submitted drawings, calculations and the authority record. A release letter if you decide to change consultant.Release letter
Consultant change (if needed)
The authority for your area
When you appoint us, the application is moved to our name on the authority system.How a consultant change works
Comments resolved
Structural Solutions
We revise the drawings and calculations and answer each comment.—
Resubmission
Developer and authority
We resubmit and follow the file with the developer and the authority.—
Through to completion
Structural Solutions
Permit, inspections and completion, with you kept updated.Sign-off delayed?

How it works

How it works

1. Send us the file

Application number and the latest comments.

2. Case review

We check where it is stuck and why.

3. Our advice

What needs fixing, and whether a consultant change helps.

4. Fix

Drawings, calculations and replies to comments.

5. Resubmit

With the developer and the authority.

6. Follow through

Permit, inspections and completion.

What keeps a file waiting

  • Resubmitting without answering every comment
  • Drawings that do not match what is built
  • Starting works before the permit is issued

Approval taking too long?

Send us the file

Send us three things on WhatsApp:

  1. Application or permit number
  2. The latest comments (a screenshot is fine)
  3. Your area and property type

Our engineers review where the file is stuck and tell you the next step.

Questions

Questions

Can I start some works while I wait?

Only works that do not need approval. Structural works and extensions wait for the permit.

What happens if I start without the permit?

The works can be stopped and a fine may apply.

Can you check what is holding it?

Yes, from the application number and the comments.

Can my contractor stay?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading