Approvals · Delays · Take-over

My Consultant Stopped Responding During the Approval

No replies, no updates, and the application is still open. You can still move forward.

If your consultant has stopped responding, start with what you can see yourself: your application number, any emails or SMS from the authority and the drawings you were given. You can appoint a new consultant. Where the outgoing consultant does not provide a release letter, the authority has its own procedure for a consultant change. We review the file and explain the steps for your authority.

What we check first

  • File: Application or permit number
  • Status: Where it is stuck
  • Comments: What the authority asked for
  • Drawings: Do they match the site?
  • Developer: NOC issued or pending
  • Next step: Who acts next

Documents you will need

  • Application or permit number
  • The latest comments or rejection notice (screenshot is fine)
  • The drawings submitted so far, if you have them
  • Title deed, or tenancy contract and landlord NOC for shops

Take-over

How we take a delayed approval forward

We review first. You decide whether to move the file to us.

StepApproval routeGuides
Case review
Our engineers
Your application or permit number, the latest comments and the drawings. We see where the file stands and what is holding it.—
Records
You and the current consultant
The submitted drawings, calculations and the authority record. A release letter if you decide to change consultant.Release letter
Consultant change (if needed)
The authority for your area
When you appoint us, the application is moved to our name on the authority system.How a consultant change works
Comments resolved
Structural Solutions
We revise the drawings and calculations and answer each comment.—
Resubmission
Developer and authority
We resubmit and follow the file with the developer and the authority.—
Through to completion
Structural Solutions
Permit, inspections and completion, with you kept updated.Sign-off delayed?

How it works

How it works

1. Send us the file

Application number and the latest comments.

2. Case review

We check where it is stuck and why.

3. Our advice

What needs fixing, and whether a consultant change helps.

4. Fix

Drawings, calculations and replies to comments.

5. Resubmit

With the developer and the authority.

6. Follow through

Permit, inspections and completion.

What keeps a file waiting

  • Resubmitting without answering every comment
  • Drawings that do not match what is built
  • Starting works before the permit is issued

Approval taking too long?

Send us the file

Send us three things on WhatsApp:

  1. Application or permit number
  2. The latest comments (a screenshot is fine)
  3. Your area and property type

Our engineers review where the file is stuck and tell you the next step.

Questions

Questions

Can I change consultant without their release letter?

The authority has a procedure for an uncooperative consultant. We explain it for your case.

What if I have no drawings?

We can request records, or survey the villa and prepare new drawings.

Is my application cancelled?

Not automatically. We check its status on the authority system.

Can you help even if works have started?

Yes. We record the works done and continue the approval.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.