My Consultant Is Taking Too Long to Get My Approval: What Can I Do?

Waiting longer than expected for a NOC or permit? First find out where the file actually is.

Ask your consultant for three things: the application number, the current status on the authority system and the latest comments. With those, our engineers can review the file and tell you what is holding it. Many delays come from open comments, missing documents or a pending developer NOC. If you want to move the file, you can appoint a new consultant and the application is transferred.

What we check first

  • File: Application or permit number
  • Status: Where it is stuck
  • Comments: What the authority asked for
  • Drawings: Do they match the site?
  • Developer: NOC issued or pending
  • Next step: Who acts next

Documents you will need

  • Application or permit number
  • The latest comments or rejection notice (screenshot is fine)
  • The drawings submitted so far, if you have them
  • Title deed, or tenancy contract and landlord NOC for shops

Take-over

How we take a delayed approval forward

We review first. You decide whether to move the file to us.

StepApproval routeGuides
Case review
Our engineers
Your application or permit number, the latest comments and the drawings. We see where the file stands and what is holding it.—
Records
You and the current consultant
The submitted drawings, calculations and the authority record. A release letter if you decide to change consultant.Release letter
Consultant change (if needed)
The authority for your area
When you appoint us, the application is moved to our name on the authority system.How a consultant change works
Comments resolved
Structural Solutions
We revise the drawings and calculations and answer each comment.—
Resubmission
Developer and authority
We resubmit and follow the file with the developer and the authority.—
Through to completion
Structural Solutions
Permit, inspections and completion, with you kept updated.Sign-off delayed?

How it works

How it works

1. Send us the file

Application number and the latest comments.

2. Case review

We check where it is stuck and why.

3. Our advice

What needs fixing, and whether a consultant change helps.

4. Fix

Drawings, calculations and replies to comments.

5. Resubmit

With the developer and the authority.

6. Follow through

Permit, inspections and completion.

What keeps a file waiting

  • Resubmitting without answering every comment
  • Drawings that do not match what is built
  • Starting works before the permit is issued

Approval taking too long?

Send us the file

Send us three things on WhatsApp:

  1. Application or permit number
  2. The latest comments (a screenshot is fine)
  3. Your area and property type

Our engineers review where the file is stuck and tell you the next step.

Questions

Questions

What should I ask my consultant for?

The application number, a screenshot of the status and the latest comments.

Can I change consultant during the approval?

Yes. The owner can appoint a new consultant and the application is transferred on the authority system.

Will I lose the work already submitted?

The drawings can be reviewed and reused where they are correct. We check them first.

Is the delay always the consultant’s fault?

Not always. The developer, missing documents or the site itself can also hold a file. The review shows which.