Food business · Which authority

Does Dubai Municipality Food Safety Approval Apply in DDA, Trakhees, DSO and DMCC Areas?

Free zones and master communities have their own authorities, but the food layout still goes to Dubai Municipality.

Yes. The food layout approval comes from Dubai Municipality Food Safety in DDA, Trakhees, DSO and DMCC areas too. What changes is the fit-out permit: it comes from the authority for the area. Civil Defence approval is needed as well. We prepare one set of drawings and submit to each.

What we prepare

  • Food layout: DM Food Safety everywhere
  • Fit-out permit: DDA, Trakhees, DSO or DMCC
  • Fire: DCD
  • NOC: Developer or landlord
  • Drawings: One matching set
  • Inspection: Before opening

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

Who approves what, by area

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Food layout
Dubai Municipality Food Safety
In every area, submitted by us.Food layout approval
DDA areas
DDA
Fit-out permit.DDA
Trakhees areas
Trakhees
Fit-out permit.Trakhees
DSO
DSO Authority
Fit-out permit.DSO
JLT and DMCC
DMCC
Fit-out permit.DMCC
Civil Defence
DCD
Fire and life safety, everywhere.DCD

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Assuming the free zone approves the food layout
  • Fit-out permit from the wrong authority
  • Skipping DCD

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Does Trakhees approve my food layout?

No. Trakhees issues the fit-out permit; the food layout goes to DM Food Safety.

And in DDA or DSO areas?

The same: the area authority for the fit-out, DM Food Safety for the layout.

Who submits?

We do, to each authority.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading