Buyer problem

I Got a Violation Notice After Buying My Villa

A notice arrived for works you did not build. Here is how to respond.

Read what the notice covers and who issued it: the developer or the authority. We survey the works it mentions, check them against the approved drawings and the structure, and prepare what is needed to respond. Built works take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case. Do not add new works until it is resolved.

FirstRead the notice
FromDeveloper or authority
RouteAs-built route

What we look at

  • Notice: What and who
  • Works: Survey
  • Structure: Check
  • Response: Drawings and documents

Documents you will need

  • Community and villa number
  • The listing or photos
  • Any drawings, NOCs or completion certificate from the seller
  • Seller or agent contact for access

How we check

Our pre-purchase villa check

The general check. We adapt it to the villa and community.

StepApproval routeGuides
Records
Developer or authority
The approved drawings, NOCs and permits on file for the villa.Getting the drawings
Site survey
Consultant
What is actually built, measured on site.—
Comparison
Consultant
Site against the approved drawings: what is approved and what is not.As-built vs approved
Structure
Structural engineer
Cracks, removed walls, added floors and loads.Structural assessment
Report
Consultant
What is approved, what is not, and what you can still build.—

How it works

How the check works

1. Send us the villa

Community, villa number and the listing.

2. Records

We request the approved drawings and records.

3. Site visit

Survey and structural check.

4. Comparison

Site against approved drawings.

5. Report

Findings and what you can build.

6. Next steps

Before or after you buy.

What causes problems

  • Ignoring the notice
  • Starting new works
  • No survey of what was built

Buying a villa?

Get it checked before you sign

Send us three things on WhatsApp:

  1. Community and villa number
  2. The listing or photos
  3. Any documents from the seller

We check the approvals and the structure and tell you what you can still build.

Questions

Questions

The works were done before I bought. Does it matter?

The notice goes to the current owner. We help you respond.

Is there a fine?

A fine may apply, depending on the case.

What should I send you?

The notice, photos and the villa number.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading