Buyer problem

The Previous Owner Removed a Wall: Is It Structural?

Open-plan living, but nobody knows if the wall that went was holding something up.

It depends on what the wall carried. A wall can support a slab, a beam or the floor above. We check the structure around the opening, compare it with the approved drawings, look for cracks or sagging, and confirm whether support is needed. If the wall was structural and removed without approval, the as-built route applies. Contact us and we help you accordingly.

Depends onWhat it carried
We checkSlab, beams, cracks
If neededSupport designed

What we look at

  • Drawings: Was it load-bearing?
  • Slab: Sagging or cracks
  • Beams: Over the opening
  • Approval: Was it approved?

Documents you will need

  • Community and villa number
  • The listing or photos
  • Any drawings, NOCs or completion certificate from the seller
  • Seller or agent contact for access

How we check

Our pre-purchase villa check

The general check. We adapt it to the villa and community.

StepApproval routeGuides
Records
Developer or authority
The approved drawings, NOCs and permits on file for the villa.Getting the drawings
Site survey
Consultant
What is actually built, measured on site.—
Comparison
Consultant
Site against the approved drawings: what is approved and what is not.As-built vs approved
Structure
Structural engineer
Cracks, removed walls, added floors and loads.Structural assessment
Report
Consultant
What is approved, what is not, and what you can still build.—

How it works

How the check works

1. Send us the villa

Community, villa number and the listing.

2. Records

We request the approved drawings and records.

3. Site visit

Survey and structural check.

4. Comparison

Site against approved drawings.

5. Report

Findings and what you can build.

6. Next steps

Before or after you buy.

What causes problems

  • No check after removal
  • Adding load above
  • Ignoring sagging

Buying a villa?

Get it checked before you sign

Send us three things on WhatsApp:

  1. Community and villa number
  2. The listing or photos
  3. Any documents from the seller

We check the approvals and the structure and tell you what you can still build.

Questions

Questions

How do you know if it was load-bearing?

From the drawings and a site check.

What if it was?

We design the support and take it through the as-built route.

Can you check before I buy?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.