Should I Get a Structural Assessment Before Taking Over an Old JAFZA Warehouse?
Older warehouses can hide problems that only show when you add racking or a mezzanine.
It is recommended, especially if you plan racking, a mezzanine, cranes or roof equipment. We check the condition of the frame, roof and slab, look for cracks, corrosion and past changes, and tell you what the building can take for your plans. It helps you avoid surprises after signing.

Official sources: Trakhees · JAFZA · Dubai Civil Defence
What decides it
- Condition: Cracks and corrosion
- Slab: Capacity for your loads
- Roof: Equipment and solar
- Past changes: Approved or not
Documents you will need
- Trade licence and lease
- Landlord NOC (or we request it with you)
- Existing drawings of the unit, if available
- Photos and what you want to change
Route
The approval route in JAFZA
The general route. We confirm it for your unit and works.
| Step | Approval route | Guides |
|---|---|---|
| Landlord NOC Step 1 | The landlord approves the works first. Trakhees approval alone is not enough. | JAFZA approvals |
| Drawings and calculations Step 2 | We prepare the drawings and stamped calculations in Trakhees format. | Structural calculations |
| Trakhees CED Step 3 | We submit as your consultant. Trakhees CED reviews and approves the works. | Who approves |
| Civil Defence (DCD) Step 4 | Fire and life safety, where the works affect it. | — |
| Inspection and completion Step 5 | Inspection, then the completion certificate. | Completion |
How it works
How we get it approved
1. Send us the details
Unit or plot, photos and what you want to do.
2. We confirm the route
Landlord NOC, Trakhees and any other approval.
3. Design
Drawings and stamped calculations.
4. Approvals
We submit to Trakhees and follow up.
5. Works
By your contractor, after approval.
6. Completion
Inspection and completion certificate.
What stops it
- Signing before checking
- Planning heavy racking on a weak slab
- Ignoring corrosion
Works in JAFZA?
Get your route confirmed
Send us three things on WhatsApp:
- Your unit or plot number
- Photos of the area
- What you want to build or change
We prepare the drawings and calculations, submit to Trakhees and follow up to completion.
Questions
Questions
Is it required by the authority?
Not always, but it protects you.
What do I get?
A report on the condition and what the building can take.
Can you check old approvals too?
Yes.
Who submits the approval in JAFZA?
An approved consultant submits it. We prepare the drawings and calculations and submit them for you; your contractor then carries out the works.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.