Plot access in Dubai usually needs both. In Nakheel communities, the chain is an RTA Access Design Study, the Nakheel Plot Access, Curb Cut and Interlock NOC, the RTA Construction NOC, then the RTA Sidewalk Modification Permit. In other communities, the developer NOC applies where there is one, followed by the same RTA steps.
Last checked: November 2026. Official sources: RTA ยท Nakheel
A new driveway or curb cut touches public land, so RTA is involved even inside a master community.
The plot access chain
- RTA Access Design Study
- Developer NOC, such as the Nakheel Plot Access, Curb Cut and Interlock NOC
- RTA Construction NOC
- RTA Sidewalk Modification Permit
- Works
- Security deposit refund
Plot access by community
| Community | Developer step | Then |
|---|---|---|
| Nakheel communities | Nakheel NOC | RTA steps |
| Palm Jumeirah | Nakheel Plot Access NOC, after the design study | RTA steps |
| Jebel Ali Hills | DCM | RTA steps |
| Dubai Hills | Emaar | RTA steps |
| Emirates Hills | Emaar | RTA steps |
| Al Barsha and Umm Suqeim | None | RTA steps |
Why drawings come back
Developers and authorities generally ask for AutoCAD drawings in DLTM coordinates, especially to show works inside and outside the plot limit. We prepare DLTM drawings from a site survey. See also the Nakheel plot access guide.
Do I need RTA approval for a driveway?
Usually, yes, because it touches public land.
Do I need the developer as well?
In developer communities, yes.
What are DLTM drawings?
AutoCAD drawings in Dubaiโs coordinate system, prepared from a site survey.
Is there a deposit?
A security deposit is refunded after the works. See the RTA deposit guide.
Related service
Plot access approvals
We prepare the study, the DLTM drawings and the NOC and RTA submissions.
Plot access process โDLTM drawings โ