Maple Townhouse Windows and Doors: What Can Change?
Maple townhouse windows and doors can change on the ground floor at the rear, without widening. First floor windows and doors cannot change.
Maple townhouse windows and doors can be replaced on the rear elevation only. Half-height ground floor windows can become full-height doors, as long as the existing opening is not widened. You can also change the opening mechanism on the ground floor, from sliding to bi-folding or swing. First floor windows and doors cannot change, and no new windows can be created on the ground or first floor. Frames, glazing, sills, lintels and finishes must stay the same as the townhouse. Safety grills, shutters or nets cannot be fixed externally where they show on the elevation.
Emaar’s guide
Window and door rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Replacement | Rear elevations only |
| Half-height windows | Can become full-height doors, without widening |
| Mechanism | Sliding to bi-folding or swing, on the ground floor |
| First floor | No modifications |
| New windows | None on the ground or first floor |
| Finish | Same materials, colours, sills, lintels and glazing |
Official sites: Emaar · Dubai Development Authority
Maple townhouse windows and doors: what can change
- New windows: Not allowed, to protect privacy and keep the elevations uniform.
- Half-height windows: Can become full-height doors, same width.
- Mechanism: Sliding can become bi-folding or swing.
- Grills and nets: Not fixed externally.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Questions
Questions people ask
Can I widen a door in my Maple townhouse?
No, the existing opening cannot be widened.
Can I add a new window?
No, new windows cannot be created on the ground or first floor.
Can I change first floor windows?
No.
Can I replace sliding doors with bi-folding doors?
Yes, on the ground floor, following the conditions in Emaar’s guide.