Maple Townhouse Main Door Relocation (Type 3C)
Maple townhouse main door relocation is allowed for Type 3C only. It counts within the 10% limit, with a 0.6 m offset from the edge of the slab.
Maple townhouse main door relocation is allowed for Type 3C only. The main door can be relocated by leaving a 0.6 m offset from the edge of the slab, and this is treated as an extension within the 10% allowable GFA. Other townhouse types cannot relocate the main door under Emaar’s guide. If you are not sure of your type, send us your unit number and any plans you have, and we will check. As with other works in Maple, this is subject to Emaar review.
Emaar’s guide
Main door rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Allowed for | Type 3C only |
| Offset | 0.6 m from the edge of the slab |
| Limit | Counts as an extension, within the 10% allowable GFA |
Official sites: Emaar · Dubai Development Authority
Maple townhouse main door relocation: the rules
- Check your type: Your plans show the unit type. Emaar provides as-built plans.
- Shares the 10%: It uses part of the same additional area as an extension.
- Matching finishes: Doors and finishes should match the townhouse.
- Other types: Not allowed under the guide.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Questions
Questions people ask
Can I move my main door?
Only on Type 3C, under Emaar’s guide.
How far can it move?
It leaves a 0.6 m offset from the edge of the slab.
Does it count as extra area?
Yes, within the 10%.
How do I know my type?
Your plans show it. Send us your unit number, and we will check.