Maple · Dubai Hills townhouses

Can I Extend My Maple Townhouse in Dubai Hills?

Can I extend my Maple townhouse? Yes, at the rear. 10% is the maximum allowed additional area, subject to Emaar review.

In Maple, 10% is the maximum allowed additional area, and it is subject to Emaar review. Additional area is allowed at the rear only, without going beyond the ground floor side and rear building line, and it needs a neighbour NOC. Front and side extensions are not allowed, and neither are detached service blocks. Patio enclosures, balcony enclosures and main door relocation all count within the same 10%. Materials, finishes and door and window details must match the townhouse, and the elevation must not change. The route is the Emaar NOC, then the DDA permit.

Maximum10% additional area
WhereRear only
NeedsNeighbour NOC

Emaar’s guide

Maple townhouse extension rules

From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.

ItemWhat the guide says
Maximum10% is the maximum allowed additional area
WhereRear only, within the ground floor side and rear building line
NeighbourNeighbour NOC needed
Not allowedFront extensions, side extensions and detached service blocks
LookSame materials, finishes, design, sills and lintels. The elevation must not change

Official sites: Emaar · Dubai Development Authority

How far you can extend your Maple townhouse

  • Front and side: Not allowed.
  • Service blocks: Detached service blocks are not allowed.
  • What shares the 10%: Patio and balcony enclosures and main door relocation.
  • Fees: Emaar charges for added floor area. See our Emaar extension fees page.

Documents you will need

  • Title deed and owner ID
  • Existing and proposed drawings and elevations
  • Detailed scope of works
  • Photos of the townhouse
  • Contractor or consultant licence
  • Building Completion Certificate

How it works

From idea to approval in Maple

1. Check

We check your idea against Emaar’s Maple guide and your plot.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved.

6. Completion

Emaar and DDA inspections, and the completion certificate.

Who does what

Who is involved

📐

Structural Solutions

Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.

Maple townhouse rules →
🏘️

Emaar

Reviews the design and issues the NOC.

Emaar approvals →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works, after the Emaar NOC.

DDA approvals →

Why applications come back

  • Design does not follow Emaar’s Maple guide
  • Materials or colours do not match the townhouse
  • Neighbour NOC missing where it is needed
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions people ask

How much can I extend my Maple townhouse?

10% is the maximum allowed additional area, subject to Emaar review.

Can I extend to the side?

No. Front and side extensions are not allowed.

Can I build a maid room in the garden?

Detached service blocks are not allowed in Maple.

Do I need my neighbour’s agreement?

Yes, a rear extension is subject to a neighbour NOC.

Who approves it?

Emaar issues the NOC, and DDA issues the building permit.

Related guides

Keep reading