Can I Get the Completion Certificate (BCC) Without My Contractor?
Can you get a completion certificate without the original contractor? Yes. If your contractor left or stopped responding, the works can still be closed.
Yes, you can get a completion certificate without the original contractor. If the contractor has left, stopped responding or closed down, a consultant surveys the finished works, prepares as-built drawings, checks the structure and prepares the owner letter pack. The works then go through the developer and authority inspections as usual. The owner letter comes from you, not the contractor. If the permit is still in the old contractor’s name, we check whether a contractor change is needed first.
Official sites: Dubai Municipality · Dubai Development Authority · Trakhees
What depends on your situation
- Unfinished works: A new contractor may need to finish them before the inspection.
- Missing papers: Send what you have. We can often obtain or redraw drawings.
- Permit name: We check whether the permit needs a contractor change.
- Changes on site: Anything different from the approved drawings must be corrected or approved.
Documents you will need
- Approved NOC and permit drawings, if you have them
- Permit number
- Photos of the finished works
- Title deed and owner ID
- Old contractor’s details, if available
- Any inspection comments received
How it works
How we get a completion certificate without the original contractor
1. Send the file
Whatever you have from the contractor.
2. Site survey
We survey and check the finished works.
3. Prepare the pack
As-built drawings, and the owner letter for you to sign.
4. Check the permit
We check whether a contractor change is needed.
5. Inspections and certificate
Developer and authority inspect, and the authority issues the certificate.
Who does what
Who does what
Structural Solutions
Prepares the as-built drawings and the owner letter pack, and requests and attends the inspections. We are a consultancy, not the developer or the authority.
Request online →Developer
Inspects the works against the approved NOC drawings. It does not issue the certificate. Any refundable deposit is returned after clearance.
Authority
DM, DDA or Trakhees carries out the final inspection and issues the certificate.
Villa completion certificate →Related guides
What can come up
- Works left unfinished
- No approved drawings to hand
- Works differ from the approved drawings
- Permit still under the old contractor
Contractor gone
When the contractor cannot or will not finish the completion certificate (BCC)
The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
On Dubai Municipality permits, Resolution 275 of 2024 lets the owner and the consultant apply without the contractor’s consent. DDA and Trakhees follow their own rules, and we confirm the route for your area.
- My contractor can’t get the completion certificate
- Completion certificate takeover service
- Contractor licence expired
- Contractor holding the documents
- Site rectification for completion
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions people ask
Is the completion certificate the same as the BCC?
The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
My contractor’s licence expired. Can I still get the BCC?
Usually yes, after the contractor on the permit is changed where works remain. See Contractor licence expired.
Can I get a completion certificate if my contractor left?
Yes. A consultant surveys the works and prepares the as-built drawings and completion pack.
Do I need a letter from the old contractor?
The required letter is the owner letter, which we prepare for you to sign.
Who finishes incomplete works?
A new contractor may need to complete them before the inspection.
Will the permit need changing?
It depends on the permit. We check whether a contractor change is needed.
What if I have no drawings?
Send us what you have. We can often obtain existing drawings, or survey and redraw.
Related guides