DCM site services information: existing utilities before you design
In DCM communities, existing cables, pipes and ducts around your plot are shown through a Site Services Information request on the Dubai Holding portal. We request it before we design and dig.
The Site Services Information request shows the existing services around your plot. We use it before designing a driveway, a sewer connection or ROW works. If more detail is needed, a trial pit NOC lets us confirm what is underground.

Official sources: Dubai Holding Community Management NOC portal · Roads and Transport Authority
Why you need it
- Driveway design: Avoid cables and pipes under the new access
- Sewer connection: Find the right connection point
- ROW works: Plan excavation safely
- Trial pits: Confirm services on site
- As-built drawings: Combine with a survey of your plot
- Fewer comments: Drawings that show existing services
Documents you will need
- Title deed and affection plan
- Plot location
- Owner letter
- Purpose of the request
NOC types
How it fits with other NOCs
Site Services Information comes first.
| NOC | Approval route | Guides |
|---|---|---|
| Site Services Information DCM | Existing utilities around the plot. | — |
| Trial pit DCM, then RTA | Confirm services in the ground. | — |
| Vehicle access design DCM, then RTA | Uses the services information. | — |
| Sewerage connection design DCM | Uses the services information. | — |
How it works
How we get it done
1. Request
Site Services Information on the portal.
2. Review
We check the services around the plot.
3. Survey
Plot and road side survey.
4. Trial pits
If needed, with a trial pit NOC.
5. Design
Drawings that avoid clashes.
6. NOCs
Submit the works NOCs.
What owners ask us about
- As-built survey
- Vehicle access and gate level
- Sewerage connection
- Right of way NOC
Common reasons for comments
- Design without existing services
- Excavation without checking services
- Missing trial pits where services are unclear
Planning works near the road?
Check the services first
Send us three things on WhatsApp:
- Your community and plot number
- Photos of the plot and road side
- What you plan to build
We request the site services information and design around it.
Questions
Questions
Is DCM the same as Dubai Holding Community Management?
Many owners and contractors still call it DCM. Today these NOCs are requested on the Dubai Holding Community Management NOC portal, and that is where we submit them.
Who can request it?
Registered consultants and contractors on the portal. We request it for you.
Why do I need it?
So the design for a driveway, sewer connection or ROW works avoids existing services.
What is DCM Site Services Information?
A request on the Dubai Holding Community Management NOC portal for the existing utilities and services around a plot.
What if the information is not clear?
A trial pit, with its own ROW NOC, confirms what is in the ground.
Is it the same as as-built drawings of my villa?
No. It covers services around the plot. For drawings of your villa, see our as-built drawings service.
Do I need it for a new driveway?
We recommend it before any vehicle access design.