DCM road closure and traffic diversion NOC
Need to close a lane for a crane, a concrete pour or road works in a DCM community? You need the road closure / traffic diversion NOC, a diversion plan, and an RTA NOC after it. Night works need their own NOC.
On the portal, road closure and traffic diversion is one NOC, applied for as new or renewal. The key drawing is the traffic diversion plan. Work at night is a separate Night Works NOC. After the community NOC, RTA approves the road side.

Official sources: Dubai Holding Community Management NOC portal · Roads and Transport Authority
When you need it
- Crane or pump: Parking a crane or concrete pump on the road
- Deliveries: Large deliveries that block a lane
- Road works: Works in the road itself
- Crossings: Services crossing the road
- Night works: Work outside normal hours
- Renewal: Closures that run longer
Documents you will need
- Traffic diversion plan (we prepare this)
- Location plan of the closure
- Planned dates and hours
- Related ROW NOC, where there is one
- Contractor trade licence
NOC types
Road closure NOCs on the portal
Two NOCs cover road closures and night work.
| NOC | Approval route | Guides |
|---|---|---|
| Road closure / traffic diversion DCM, then RTA | Full or partial closure of a community road, with a diversion plan. New or renewal. | — |
| Night Works NOC DCM | Works outside normal working hours. New or renewal. | — |
How it works
How we get it done
1. Plan
Where, when and how long the closure is.
2. Diversion plan
Signs, barriers and the traffic route.
3. DCM NOC
Road closure / traffic diversion on the portal.
4. Night works
Night Works NOC if needed.
5. RTA NOC
For the road side.
6. On site
Set up as approved; renew if needed.
What owners ask us about
Common reasons for comments
- No traffic diversion plan
- Closure longer than needed
- Night work without a Night Works NOC
- Set-up on site different from the plan
Need to close a road?
Get your closure approved
Send us three things on WhatsApp:
- Your community and the road
- The dates and hours
- Why the road needs closing
We prepare the diversion plan and handle the DCM and RTA NOCs.
Questions
Questions
Is DCM the same as Dubai Holding Community Management?
Many owners and contractors still call it DCM. Today these NOCs are requested on the Dubai Holding Community Management NOC portal, and that is where we submit them.
Do I also need an RTA NOC?
Yes, for works on the road side. The RTA NOC follows the DCM NOC.
What is a traffic diversion plan?
A drawing that shows the closure, the signs and barriers, and the route traffic will take. We prepare it.
When do I need a road closure NOC in a DCM community?
For any full or partial closure of a community road, including parking a crane or concrete pump on the road.
Can I close one lane for a delivery?
A partial closure still needs the road closure / traffic diversion NOC.
When do I need a Night Works NOC?
When works run outside normal working hours, for example a night concrete pour.
Can a road closure NOC be renewed?
Yes. Apply for a renewal before it expires if the closure runs longer.
What must be on site during the closure?
The signs and barriers shown on the approved plan, set up as approved, with the NOC available on site.
Do I also need a ROW NOC?
If the works themselves are in the road reserve, yes. The road closure NOC covers the closure, not the works.
Who can apply for a DCM NOC?
Only registered consultants and contractors can apply on the Dubai Holding Community Management NOC portal. Owners cannot apply themselves. We are registered and submit for our clients.
Related guides
Keep reading
Cranes, road closures and diversions
- RTA crane permit for truck and mobile cranes
- Do I need an RTA permit for a truck crane on the road?
- RTA road closure permit for construction
- How do I close part of a road for construction?
- RTA road diversion permit
- Temporary lane closure permit
- RTA footpath closure permit
- RTA permit for trucks delivering to a construction site
