Digging, laying cables or pipes, dewatering or landscaping in the road reserve of a DCM community needs a works in ROW NOC, followed by an RTA NOC. Only registered consultants and contractors can apply. We do it for you.
In DCM communities, the road reserve outside your plot belongs to the community. Any work there, even a trial pit, needs the right works in ROW NOC from the Dubai Holding Community Management portal, then an RTA NOC. When the works finish, the ROW Work Completion Certificate is issued after inspection.

Official sources: Dubai Holding Community Management NOC portal · Roads and Transport Authority
Right of way works that need a NOC
- Excavation: Anchoring, shoring and excavation near the boundary
- Cables and pipes: Cable laying and pipe laying
- Crossings: Road crossings, drilling, NDRC, existing ducts
- Dewatering: Pumping groundwater during excavation
- Services: Relocating or adjusting existing services
- Landscaping: Planting, paving or irrigation outside the plot
Documents you will need
- Title deed and affection plan
- Owner letter
- ROW drawings and sections (we prepare these)
- Site services information for the area
- Contractor trade licence
- Planned start date and duration
NOC types
The 14 right of way NOC types
Each one has its own form on the portal.
| NOC | Approval route | Guides |
|---|---|---|
| Anchoring, shoring, excavation DCM, then RTA | Digging, shoring or anchors that reach into the road reserve. | — |
| Cable laying DCM, then RTA | New power, telecom or other cables in the road reserve. | — |
| Drilling, NDRC, existing ducts DCM, then RTA | Crossing under the road by drilling, or using existing ducts. | — |
| Dewatering DCM, then RTA | Pumping and discharging groundwater during excavation. | — |
| Encroachment at ROW DCM, then RTA | Anything built or placed in the road reserve. | — |
| Landscaping DCM, then RTA | Planting, paving or irrigation outside the plot. | — |
| Pipe laying DCM, then RTA | Water, irrigation or drainage pipes in the road reserve. | — |
| Road crossing DCM, then RTA | Services crossing the road. | — |
| Service relocation or adjustment DCM, then RTA | Moving or adjusting existing services that clash with your works. | — |
| Trial pit DCM, then RTA | A small excavation to find existing services. | — |
| Others DCM, then RTA | ROW works not listed above. | — |
| Revision DCM | Changes to an approved ROW NOC. | — |
| Renewal DCM | More time for the works. | — |
| ROW Work Completion Certificate DCM | Issued after the finished works are inspected. | — |
How it works
How we get it done
1. Check the works
What reaches the road reserve.
2. Services
Site services information and trial pits if needed.
3. Drawings
ROW layout, sections and reinstatement.
4. DCM NOC
The right ROW NOC type on the portal.
5. RTA NOC
For the road side.
6. Completion
Inspection and the ROW Work Completion Certificate.
What owners ask us about
- Site services information
- Road closure and night works
- RTA right of way NOC
- Built inside the right of way?
Common reasons for comments
- Existing services not shown
- No reinstatement details
- Wrong ROW NOC type
- NOC expired during the works
Working in the road reserve?
Get your ROW NOC route
Send us three things on WhatsApp:
- Your community and plot number
- Photos of the road side
- What you need to dig, lay or build
We prepare the ROW drawings and handle the DCM and RTA NOCs.
Questions
Questions
Is DCM the same as Dubai Holding Community Management?
Many owners and contractors still call it DCM. Today these NOCs are requested on the Dubai Holding Community Management NOC portal, and that is where we submit them.
Do I also need an RTA NOC?
Yes, for works on the road side. The RTA NOC follows the DCM NOC.
When do I need a DCM ROW NOC?
For any work in the road reserve, such as excavation, cables, pipes, dewatering, crossings, landscaping or trial pits.
What is the right of way in a DCM community?
The land between plot boundaries and the road: verges, footpaths, kerbs and service corridors.
Do I need a ROW NOC for excavation next to my boundary?
Yes, if the excavation, shoring or anchors reach into the road reserve. There is a separate NOC for anchoring, shoring and excavation.
Do I need a NOC for dewatering?
Yes. Pumping groundwater during excavation needs the works in ROW dewatering NOC.
Do I need a NOC for cable or pipe laying?
Yes. Cable laying and pipe laying each have their own ROW NOC, and crossings under the road have another.
What is a trial pit NOC?
A NOC for a small excavation to find existing services before design or works.
What if existing services clash with my works?
A service relocation or adjustment NOC is needed before they are moved.
Something was built in the road reserve. What now?
It needs the encroachment at ROW NOC, to regularise it or plan its removal. We review it and advise.
Do I need a NOC for landscaping outside my villa?
Yes. Planting, paving or irrigation in the road reserve needs the ROW landscaping NOC.
How do I renew or revise a ROW NOC?
Apply for a renewal before the NOC expires, or a revision when the design changes.
What is the ROW Work Completion Certificate?
The certificate issued after the finished works are inspected. It closes the ROW NOC.
Who can apply for a DCM NOC?