Is mall approval enough for a shop fit-out in Dubai?

No. Mall approval for a shop fit-out is only one step: Civil Defence (DCD) approval is needed in every case, and some malls also need a DDA or Trakhees permit.

The short answer

The mall approves the design first, but mall approval for a shop fit-out is not enough on its own. Dubai Civil Defence (DCD) must approve the fire and life safety design for every mall shop fit-out, especially when the layout or partitions change, and carries out a final inspection before opening. Depending on the mall, an authority permit may also be needed: for example Dubai Hills Mall goes through DDA, and Nakheel malls and Atlantis through Trakhees. DEWA approval is usually not needed, except in some cases such as a load increase.

Mall approvalAlways first
DCDNeeded in every case
Authority permitDepends on the mall

Mall approval for a shop fit-out: what you need to know

  • Mall first: The mall fit-out team reviews the stamped drawings.
  • DCD always: Fire and life safety approval and final inspection.
  • DDA or Trakhees: Where the mall sits in their area, a permit may be needed.
  • DEWA: Usually not needed, except for cases like a load increase.

What to send us

  • Mall unit drawings and the tenant fit-out guide
  • Interior design layout and reflected ceiling plan
  • Lease, offer letter or tenancy contract
  • Trade licence of the tenant or brand
  • Mall fit-out application forms, if already issued

Who does what

From design to opening

We confirm the exact route for your mall.

StepApproval routeGuides
Brief and mall rules
You and us
The unit drawings, the mall tenant fit-out guide and the services the mall provides to the unit.Documents for mall fit-out approval
MEP design and calculations
Structural Solutions
HVAC, power and lighting, fire alarm, sprinklers, plumbing and drainage, with the design calculations.MEP drawings for malls
Mall approval
Consultant → mall
Stamped drawings submitted to the mall fit-out team for review.Consultant stamp
Authority permit, where the mall needs one
Consultant → DDA or Trakhees
For example Dubai Hills Mall goes to DDA; Nakheel malls and Atlantis go to Trakhees.Authority permit
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval, needed for every mall shop fit-out, especially when the layout or partitions change.DCD approval
Final inspection
Mall, authority and DCD
DCD final inspection and completion before the shop opens.Shop fit-out sign-off

Questions

More questions about mall approval for a shop fit-out

Can I start works after mall approval?

Not before DCD and any authority approval the mall needs are in place.

Does every mall shop need DCD?

Yes, every mall shop fit-out needs DCD approval.

Who submits to DCD?

We do, as consultant.

What about signage?

Shop signage has its own approval.