Mall Fit-Outs · MEP Package

What does a mall shop MEP package include?

A mall shop MEP package includes HVAC, power and lighting, fire alarm, sprinkler and plumbing drawings with calculations, prepared to the mall tenant guide and approved by the mall and DCD.

The short answer

A typical mall shop MEP package has: HVAC layout and cooling load calculation, connected to the mall chilled water or AC supply; power and lighting layouts with the load schedule and distribution board; fire alarm and sprinkler layouts coordinated with the ceiling; and plumbing and drainage where the shop has a sink or washroom. Drawings follow the mall tenant guide and are stamped by the consultant for the mall and DCD submission. A BOQ is not part of our package; the contractor prices the works from the drawings.

DrawingsHVAC, electrical, fire, plumbing
CalculationsCooling and electrical loads
Stamped forMall and DCD

Mall shop MEP package: what you need to know

  • HVAC: Layout and cooling load, connected to the mall supply.
  • Electrical: Lighting, power, load schedule and distribution board.
  • Fire safety: Fire alarm and sprinklers coordinated with the ceiling, approved by DCD.
  • Plumbing: Only where the shop has a sink, pantry or washroom.

What to send us

  • Mall unit drawings and the tenant fit-out guide
  • Interior design layout and reflected ceiling plan
  • Lease, offer letter or tenancy contract
  • Trade licence of the tenant or brand
  • Mall fit-out application forms, if already issued

Who does what

From design to opening

We confirm the exact route for your mall.

StepApproval routeGuides
Brief and mall rules
You and us
The unit drawings, the mall tenant fit-out guide and the services the mall provides to the unit.Documents for mall fit-out approval
MEP design and calculations
Structural Solutions
HVAC, power and lighting, fire alarm, sprinklers, plumbing and drainage, with the design calculations.MEP drawings for malls
Mall approval
Consultant → mall
Stamped drawings submitted to the mall fit-out team for review.Consultant stamp
Authority permit, where the mall needs one
Consultant → DDA or Trakhees
For example Dubai Hills Mall goes to DDA; Nakheel malls and Atlantis go to Trakhees.Authority permit
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval, needed for every mall shop fit-out, especially when the layout or partitions change.DCD approval
Final inspection
Mall, authority and DCD
DCD final inspection and completion before the shop opens.Shop fit-out sign-off

Questions

More questions about mall shop MEP package

Is a BOQ included?

No. We prepare the design and calculations; the contractor prices the works.

Who approves the MEP drawings?

The mall fit-out team, then DCD for fire and life safety, and DDA or Trakhees where the mall needs a permit.

Do small shops need the full package?

Yes, even small shops need MEP drawings for the mall and DCD.

Can the drawings be reused for another mall?

Each mall has its own tenant guide, so the design is adapted for each mall.