Who Can Submit to DIEZ for a DSO Permit?
An approved consultant submits to the DSO Authority, and contractors can submit too. Villa applications go through an approved consultant.
Applications to the DSO Authority, part of DIEZ, are submitted by an approved consultant, and contractors can submit too. For Cedre Villas, the application goes through an approved consultant. As the consultant, we prepare the drawings and calculations and handle the submission.
What you need to know
- Owners and tenants: Appoint a consultant or contractor.
- Drawings: Stamped by the consultant.
- Civil Defence: Submitted as well.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or landlord NOC
- Existing or as-built drawings of the unit
- Proposed fit-out or modification drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Structural calculations where the works need them
By type of unit
DIEZ approvals by type of unit
We confirm the route for your unit.
| Unit | Approval route | Guides |
|---|---|---|
| Office Building NOC, DSO Authority, DCD | Layout and fire safety. | DSO fit-out |
| Shop or showroom Building NOC, DSO Authority, DCD | Layout and signage. | Shops |
| Restaurant or café Plus DM Food Safety | Kitchen layout; LPG provider approval or electric undertaking. | Restaurants |
| Clinic Plus DHA | Health facility approval. | Clinics |
| Warehouse Building NOC, DSO Authority, DCD | Mezzanine and racking checked. | Mezzanine and racking |
| Villa (Cedre Villas) Through an approved consultant | To the DSO Authority. | DSO building permit |
How it works
How we get your DIEZ permit
1. Review
The unit, the works and the drawings you have.
2. Building NOC
From building management or the landlord.
3. Drawings
Fit-out or modification drawings, and calculations if needed.
4. DSO Authority (DIEZ)
Fit-out or building permit.
5. Civil Defence
Fire safety approval.
6. Inspection
Inspection and completion.
Who does what
Who approves works in Dubai Silicon Oasis
Building management or landlord
Their NOC comes first. There is no developer NOC in Dubai Silicon Oasis.
Building NOC →DSO Authority (DIEZ)
The Dubai Silicon Oasis Authority, part of DIEZ, issues the fit-out and building permits.
What is DIEZ? →Structural Solutions
As the consultant, prepares the drawings and calculations and submits to the DSO Authority.
DSO approval services →What we prepare
Why DIEZ submissions get returned
- Building management or landlord NOC missing
- Drawings that do not match the unit
- Fire safety changes without DCD approval
- Structural changes without calculations
- Works started before the permit
Questions
Questions owners and tenants ask
Can I submit to DIEZ myself?
Submissions are made by an approved consultant or a contractor.
Can my contractor submit?
Yes.
Who submits for villas?
An approved consultant.