Dubai Silicon Oasis · Rejections

DSO Authority or Civil Defence Rejected My Fit-Out: What Now?

Read the comments, correct the drawings and resubmit. We can take over a rejected DSO Authority or Civil Defence submission as consultant.

A rejection from the DSO Authority (part of DIEZ) or from Civil Defence comes with comments. The drawings are corrected to answer each comment and resubmitted; if the fire safety drawings change, Civil Defence reviews them again, and if the layout changes, the DSO Authority does too. Most rejections come from a missing building NOC, drawings that do not match the unit, fire safety items not shown, or structural changes without calculations. We can review the comments and resubmit as consultant.

FirstRead the comments
ThenCorrect and resubmit
HelpWe take over as consultant

What you need to know

  • DSO Authority comments: Usually layout, documents or the building NOC.
  • Civil Defence comments: Sprinklers, alarm, exits or emergency lighting.
  • Both affected: A layout change can need both approvals again.
  • Works: Wait for the approval before continuing.

Documents you will need

  • Lease or title deed, and trade licence for businesses
  • Building management or landlord NOC
  • Existing or as-built drawings of the unit
  • Proposed fit-out drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence
  • Structural calculations where loads or openings change

By type of unit

Approvals by type of unit in DSO

We confirm the route for your unit.

UnitApproval routeGuides
Office
Building NOC, DSO Authority, DCD
Layout, MEP and fire safety.Offices
Retail shop
Building NOC, DSO Authority, DCD
Shop front and signage too.Shops
Restaurant or cafe
Plus DM Food Safety
Kitchen layout, LPG or electric cooking.Restaurants
Clinic
Plus DHA
Health facility approval.Clinics
Warehouse or industrial
Building NOC, DSO Authority, DCD
Racking, mezzanines, floor loads.Warehouses

How it works

How we get your DSO approval

1. Review

The unit, the planned works and the drawings you have.

2. Drawings

Existing drawings, or we survey and redraw the unit.

3. Building NOC

From building management or the landlord.

4. DSO Authority

Fit-out or building permit, part of DIEZ.

5. Civil Defence

Fire safety drawings approved.

6. Works

Carried out to the approved drawings.

7. Completion

Inspection and completion before the unit opens.

Who does what

Who approves it in Dubai Silicon Oasis

🏢

Building management or landlord

Issues the NOC for the works in your unit. There is no developer NOC in DSO.

Building NOC →
🏛️

DSO Authority (DIEZ)

Issues the fit-out or building permit for works in Dubai Silicon Oasis.

DIEZ approval →
🚒

Dubai Civil Defence

Approves the fire safety for every commercial fit-out change and inspects before completion.

DSO and DCD →
📐

Structural Solutions

Prepares the drawings and calculations and handles the submissions as consultant.

Talk to our engineers →

What we prepare

Why DSO submissions get returned

  • Building management or landlord NOC missing
  • Drawings that do not match the unit on site
  • Fire safety changes not shown for Civil Defence
  • Structural changes without stamped calculations
  • Works started before the permit

Questions

Questions tenants and owners ask

Can you take over a rejected submission?

Yes, we review the comments and resubmit as consultant.

DCD rejected my DSO fit-out: what now?

Correct the fire safety drawings and resubmit to Civil Defence.

Why do fit-outs get rejected?

Missing NOC, drawings not matching the unit, fire safety not shown, or no calculations.

Does the DSO Authority need to see DCD changes?

If the layout changes, yes.

Related guides

Keep reading