DSO Change of Use Approval: Office to Clinic, Shop, Gym or Restaurant

Changing what a Dubai Silicon Oasis unit is used for needs the building NOC, the DSO Authority (DIEZ) permit for the new use, Civil Defence and, where loads change, a structural assessment.

A change of use in Dubai Silicon Oasis, for example an office into a clinic, a shop into a cafe or a unit into a gym, is approved through the building management or landlord NOC, the DSO Authority permit for the new use, and Civil Defence for the new occupancy and fire safety. If the new use adds load, such as equipment, storage or a kitchen, a structural assessment checks the floor. Some uses add their own approvals: DHA for clinics and DM Food Safety for restaurants and cafes.

FirstBuilding or landlord NOC
StructureAssessment where loads change
ExtraDHA or DM Food Safety by use

What you need to know

  • Building first: The landlord or building management must accept the new use.
  • New occupancy: More people or a new activity changes the fire safety.
  • Structural assessment: Checks the floor for the new loads.
  • Clinics: DHA approval as well.
  • Restaurants and cafes: DM Food Safety layout approval as well.

Documents you will need

  • Lease or title deed, and trade licence for businesses
  • Building management or landlord NOC
  • Existing or as-built drawings of the unit
  • Proposed fit-out drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence
  • Structural calculations where loads or openings change

By type of unit

Common changes of use in DSO

We confirm the route for your unit.

From and toApproval routeGuides
Office to clinic
Plus DHA
Health facility.Clinics
Shop or office to cafe
Plus DM Food Safety
Kitchen layout and LPG.Restaurants
Unit to gym
Plus a floor check
Weights and equipment.Gyms
Office to training centre
DCD for occupancy
Exits for groups.Training centres
Unit to storage
Racking and loads
Calculations.Warehouses

How it works

How we get your DSO approval

1. Review

The unit, the planned works and the drawings you have.

2. Drawings

Existing drawings, or we survey and redraw the unit.

3. Building NOC

From building management or the landlord.

4. DSO Authority

Fit-out or building permit, part of DIEZ.

5. Civil Defence

Fire safety drawings approved.

6. Works

Carried out to the approved drawings.

7. Completion

Inspection and completion before the unit opens.

Who does what

Who approves it in Dubai Silicon Oasis

🏢

Building management or landlord

Issues the NOC for the works in your unit. There is no developer NOC in DSO.

Building NOC →
🏛️

DSO Authority (DIEZ)

Issues the fit-out or building permit for works in Dubai Silicon Oasis.

DIEZ approval →
🚒

Dubai Civil Defence

Approves the fire safety for every commercial fit-out change and inspects before completion.

DSO and DCD →
📐

Structural Solutions

Prepares the drawings and calculations and handles the submissions as consultant.

Talk to our engineers →

Why DSO submissions get returned

  • Building management or landlord NOC missing
  • Drawings that do not match the unit on site
  • Fire safety changes not shown for Civil Defence
  • Structural changes without stamped calculations
  • Works started before the permit

Questions

Questions tenants and owners ask

Who approves a change of use in DSO?

The DSO Authority (DIEZ) after the building NOC, with Civil Defence.

Can I change an office into a clinic in DSO?

Often yes, with the DSO Authority permit, Civil Defence and DHA.

Do I need a structural assessment?

When the new use adds load, yes.

Does the landlord need to agree?

Yes, the building or landlord NOC comes first.