Mall Fit-Outs · Approvals

Who gets the mall fit-out approval: the tenant or the contractor?

Either can appoint the consultant. The consultant stamps and submits the drawings; the tenant, contractor or brand can appoint us.

The short answer

Either can. The mall needs drawings stamped by a consultant, and the consultant submits to the mall, to DCD and to the authority where the mall needs one. The tenant, the fit-out contractor or the brand can appoint Structural Solutions as that consultant. The trade licence and tenancy contract come from the tenant; the drawings come from the contractor or from us.

Appoints usTenant, contractor or brand
From the tenantTrade licence and tenancy
From the contractorFit-out drawings

Need the stamp?

Upload your fit-out drawings and trade licence. We stamp them as consultant and initiate the mall, authority and DCD approvals on your behalf.

Request a mall fit-out stamp →

What you need to know

  • Consultant stamp: Drawings stamped by a consultant, not by the fit-out contractor.
  • Drawings: Architectural partitions and ceilings, MEP and fire safety.
  • DCD: Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.
  • Who appoints us: The fit-out contractor, the tenant or the brand.

Documents for the submission

  • Trade licence and tenancy contract (lease or Ejari)
  • Unit plan and the mall or landlord fit-out requirements
  • Fit-out drawings: partitions, ceilings and finishes
  • MEP and fire safety drawings
  • Fit-out contractor details

Who does what

Step by step

We confirm the route for your unit before you start.

StepApproval routeGuides
Drawings and stamp
Structural Solutions (consultant)
Partition, ceiling, MEP and fire safety drawings, stamped as consultant.Which drawings?
Mall approval
The mall
Reviews and approves the stamped drawings.Mall or authority?
Authority permit (some malls)
Consultant → DDA or Trakhees
For example DDA for Dubai Hills Mall, Trakhees for Nakheel malls and Atlantis.Dubai Hills Mall
Nakheel malls
DCD approval
Structural Solutions → DCD
Fire and life safety approval, submitted by us as consultant.DCD for mall fit-outs
Final inspection
DCD and the mall
Final inspection and completion certificate before opening.What DCD checks

Questions

Related questions

Does the tenant need to sign anything?

The tenant provides the trade licence and tenancy contract for the submission.

Can the contractor manage the whole process?

Yes. The contractor can appoint us and coordinate with the tenant.

Who receives the approvals?

We share every approval with whoever appointed us and the tenant.

Do brands use one consultant for many stores?

Yes. We handle roll-outs mall by mall.