Do partition changes in a mall shop need approval?
Yes. Partition changes need consultant-stamped drawings for the mall and Dubai Civil Defence approval.
The short answer
Yes. Moving, adding or removing partitions in a mall shop changes the layout and the escape routes, so it needs consultant-stamped architectural partition drawings for the mall and Dubai Civil Defence (DCD) approval, followed by a DCD final inspection. Some malls also need an authority permit, such as DDA at Dubai Hills Mall or Trakhees in Nakheel malls. Structural Solutions prepares and stamps the drawings and submits them.
Need the stamp?
Upload your fit-out drawings and trade licence. We stamp them as consultant and initiate the mall, authority and DCD approvals on your behalf.
Request a mall fit-out stamp →What you need to know
- Consultant stamp: Drawings stamped by a consultant, not by the fit-out contractor.
- Drawings: Architectural partitions and ceilings, MEP and fire safety.
- DCD: Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.
- Who appoints us: The fit-out contractor, the tenant or the brand.
Documents for the submission
- Trade licence and tenancy contract (lease or Ejari)
- Unit plan and the mall or landlord fit-out requirements
- Fit-out drawings: partitions, ceilings and finishes
- MEP and fire safety drawings
- Fit-out contractor details
Who does what
Step by step
We confirm the route for your unit before you start.
| Step | Approval route | Guides |
|---|---|---|
| Drawings and stamp Structural Solutions (consultant) | Partition, ceiling, MEP and fire safety drawings, stamped as consultant. | Which drawings? |
| Mall approval The mall | Reviews and approves the stamped drawings. | Mall or authority? |
| Authority permit (some malls) Consultant → DDA or Trakhees | For example DDA for Dubai Hills Mall, Trakhees for Nakheel malls and Atlantis. | Dubai Hills Mall Nakheel malls |
| DCD approval Structural Solutions → DCD | Fire and life safety approval, submitted by us as consultant. | DCD for mall fit-outs |
| Final inspection DCD and the mall | Final inspection and completion certificate before opening. | What DCD checks |
Questions
Related questions
Does a small partition change need DCD?
Yes. Every partition change needs DCD approval.
What about ceilings and decoration?
They need DCD approval too.
Who stamps the drawings?
A consultant. We stamp them and submit to DCD.
Can I change partitions after opening?
Only with the mall and DCD approvals again.