Mall Fit-Outs · Consultant Stamp

Can a fit-out contractor stamp their own drawings?

No. Malls and Dubai Civil Defence ask for drawings stamped by a consultant, so the contractor works with a consultant.

No. When a mall asks for a consultant stamp, the fit-out contractor cannot stamp the drawings themselves. A consultant checks and stamps the architectural partition, ceiling, MEP and fire safety drawings, and the consultant also submits to Dubai Civil Defence (DCD). Structural Solutions works with fit-out contractors as their consultant, so the contractor keeps the build and we handle the stamp and approvals.

Contractor stampNot accepted as a consultant stamp
ConsultantStamps and submits to DCD
ContractorBuilds the works

Need the stamp?

Upload your fit-out drawings and trade licence. We stamp them as consultant and initiate the mall, authority and DCD approvals on your behalf.

Request a mall fit-out stamp →

What you need to know

  • Consultant stamp: Drawings stamped by a consultant, not by the fit-out contractor.
  • Drawings: Architectural partitions and ceilings, MEP and fire safety.
  • DCD: Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.
  • Who appoints us: The fit-out contractor, the tenant or the brand.

Documents for the submission

  • Trade licence and tenancy contract (lease or Ejari)
  • Unit plan and the mall or landlord fit-out requirements
  • Fit-out drawings: partitions, ceilings and finishes
  • MEP and fire safety drawings
  • Fit-out contractor details

Who does what

Step by step

We confirm the route for your unit before you start.

StepApproval routeGuides
Drawings and stamp
Structural Solutions (consultant)
Partition, ceiling, MEP and fire safety drawings, stamped as consultant.Which drawings?
Mall approval
The mall
Reviews and approves the stamped drawings.Mall or authority?
Authority permit (some malls)
Consultant → DDA or Trakhees
For example DDA for Dubai Hills Mall, Trakhees for Nakheel malls and Atlantis.Dubai Hills Mall
Nakheel malls
DCD approval
Structural Solutions → DCD
Fire and life safety approval, submitted by us as consultant.DCD for mall fit-outs
Final inspection
DCD and the mall
Final inspection and completion certificate before opening.What DCD checks

Questions

Related questions

Can you stamp drawings my team prepared?

Yes. We review them, request any changes, and stamp them as consultant.

Do you submit to DCD too?

Yes. We submit to DCD as consultant.

Do you work with many contractors?

Yes. We work for fit-out contractors, tenants and brands.

Does the stamp cover every mall?

Each mall approves its own submission. We prepare a submission for each.