Mall Fit-Outs · Dubai Outlet Mall

Who can stamp fit-out drawings for Dubai Outlet Mall?

A consultant. Dubai Outlet Mall asks for the MEP, fire and architectural partition drawings to carry a consultant stamp before it approves a fit-out.

A consultant. Dubai Outlet Mall fit-outs need the mall's approval of consultant-stamped MEP, fire and architectural partition drawings, plus Dubai Civil Defence (DCD) approval. Structural Solutions prepares or reviews the drawings, stamps them as consultant, gets the mall approval and submits to DCD. We work for the fit-out contractor, the tenant or the brand.

Who stampsA consultant
DrawingsMEP, fire, architectural partitions
Also neededDCD approval

Need the stamp?

Upload your fit-out drawings and trade licence. We stamp them as consultant and initiate the mall, authority and DCD approvals on your behalf.

Request a mall fit-out stamp →

What you need to know

  • Consultant stamp: Drawings stamped by a consultant, not by the fit-out contractor.
  • Drawings: Architectural partitions and ceilings, MEP and fire safety.
  • DCD: Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.
  • Who appoints us: The fit-out contractor, the tenant or the brand.

Documents for the submission

  • Trade licence and tenancy contract (lease or Ejari)
  • Unit plan and the mall or landlord fit-out requirements
  • Fit-out drawings: partitions, ceilings and finishes
  • MEP and fire safety drawings
  • Fit-out contractor details

Who does what

Step by step

We confirm the route for your unit before you start.

StepApproval routeGuides
Drawings and stamp
Structural Solutions (consultant)
Partition, ceiling, MEP and fire safety drawings, stamped as consultant.Which drawings?
Mall approval
The mall
Reviews and approves the stamped drawings.Mall or authority?
Authority permit (some malls)
Consultant → DDA or Trakhees
For example DDA for Dubai Hills Mall, Trakhees for Nakheel malls and Atlantis.Dubai Hills Mall
Nakheel malls
DCD approval
Structural Solutions → DCD
Fire and life safety approval, submitted by us as consultant.DCD for mall fit-outs
Final inspection
DCD and the mall
Final inspection and completion certificate before opening.What DCD checks

Questions

Related questions

Can my fit-out contractor stamp the drawings?

No. The mall asks for a consultant stamp, so we stamp the drawings and work alongside your contractor.

Which drawings need the stamp?

The MEP, fire safety and architectural partition drawings.

Is DCD approval needed at Dubai Outlet Mall?

Yes. Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.

Who can appoint you?

The fit-out contractor, the tenant or the brand.

Related guides

Keep reading