Glass Enclosure Wind Load Calculations in Dubai
Glass around a terrace must resist the wind safely, and the outlet’s approvals follow.
A glass enclosure around a restaurant or cafe terrace must resist Dubai wind: the glass, frames and fixings, and the floor or structure they sit on. Our engineers calculate the loads and stamp the calculations. The enclosure also changes the outlet, so it goes through the landlord, developer or mall NOC, the authority permit, DM Food Safety layout re-approval and Civil Defence.

Official sources: Dubai Municipality · DDA
What we check
- Glass: Size and thickness
- Frames: Sliding or folding
- Fixings: Floor and ceiling
- Exposure: Open terrace
- Approvals: NOC, permit, DCD
- Report: Stamped
Documents you will need
- Drawings or a sketch with sizes
- Material and profile details
- Location and height
- Photos of the supporting structure
Process
How we prepare the calculations
The general process. We confirm what your submission needs.
| Step | Approval route | Guides |
|---|---|---|
| Details You | Drawings, sizes, materials and location. | — |
| Wind loads Our engineers | Pressure and suction for the location and height. | — |
| Members Our engineers | Glass and frames checked for wind. | — |
| Fixings Our engineers | Fixings and the supporting structure checked. | — |
| Report Structural Solutions | Stamped calculations and details. | — |
| Submission Approving body | With the NOC, permit or approval. | — |
How it works
How we work
1. Send us the details
Drawings, sizes and location.
2. Site
Height and supporting structure.
3. Loads
Wind pressure and suction.
4. Design
Members and fixings.
5. Report
Stamped calculations.
6. Submission
Comments answered.
Related questions
- wind-load-calculations-dubai
- Can I close my restaurant terrace with glass?
- Restaurant extension approval
- Window and door wind load
What causes problems
- Fixings not designed
- Food layout not re-approved
- No DCD approval
Need wind load calculations?
Get a stamped report for your submission
Send us three things on WhatsApp:
- Structure and size
- Materials
- Location and height
Our engineers calculate the wind loads, check the fixings and prepare the report.
Questions
Questions
Do glass enclosures need wind load calculations?
Yes, for the glass, frames and fixings.
Does it change my food approval?
Yes, any layout change needs DM Food Safety re-approval.
What if it was already built?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
