Can I Change My Boundary Wall or Gate in Tilal Al Furjan?
Can I Change My Boundary Wall or Gate in Tilal Al Furjan? Changes need a Nakheel NOC, and Nakheel reviews the height, design and effect on neighbours and the street.
Boundary walls and gates are part of the community’s look, so any change, such as raising, rebuilding or replacing a gate, needs a Nakheel NOC. Nakheel reviews the design against the community and the neighbours. New or raised walls need stamped structural calculations.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing area: measured from the Nakheel villa plans and on site.
- Unapproved works: older changes that would show in the Nakheel VSR are approved first.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Tilal Al Furjan
- Title deed and owner ID
- A sketch or short description of the idea
- Nakheel villa plans, if you have them
Who does what
The approval route in Tilal Al Furjan
Nakheel first, then Trakhees. Tilal Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides. | — |
| Nakheel NOC Nakheel | NOC. Nakheel reviews the design and confirms its fees. | Nakheel extension fees |
| Permit Trakhees | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Nakheel and Trakhees | Inspections during and after the works. | — |
| Completion Trakhees | Completion certificate that closes the permit; Nakheel updates its records. | — |
How it works
How it works in Tilal Al Furjan
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Nakheel villa plans, a site check, drawings and stamped calculations where needed.
We get it approved
Nakheel NOC, then the Trakhees permit where the works are structural.
Guides for works in Tilal Al Furjan
What each work needs in Tilal Al Furjan
- Extension: Nakheel NOC, Trakhees permit and stamped calculations
- Wall removal: structural check, Nakheel NOC and Trakhees permit
- Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
- Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
- External colour or façade: Nakheel NOC
- Internal finishes only: usually no permit; check with Nakheel first
Questions
Questions owners ask in Tilal Al Furjan
Can I raise my boundary wall?
Nakheel reviews any change to wall height and design. It needs a Nakheel NOC and stamped calculations for the wall and foundation.
Can I replace my gate?
A new gate changes the street view, so it needs a Nakheel NOC with the design and materials.
Do I need my neighbour’s agreement?
Shared boundary walls affect the neighbour, and Nakheel can ask for their consent. We include it when needed.
Can I attach a pergola or shade to the boundary wall?
Boundary walls are often not designed for extra load. Shades are usually freestanding or fixed to the villa.
What if the wall was changed without approval?
It needs a retrospective approval with drawings, or must be restored.