Tilal Al Furjan · Nakheel · Villa

My Parent Can’t Use the Stairs: Can I Add a Lift in Tilal Al Furjan?

Can I add a lift in Tilal Al Furjan? Often, yes. A home lift inside the villa or in a small external shaft needs a Nakheel NOC and a Trakhees permit for the slab openings and structure.

The short answer

A lift can usually be added to a villa in Tilal Al Furjan, inside the villa or in an external shaft. It needs openings in the slabs, a lift pit and a structural design with stamped calculations. The works need a Nakheel NOC and a Trakhees permit. An external shaft that adds floor area counts toward the extension allowance.

Developer NOCNakheel online portal
AuthorityTrakhees
PlansNakheel provides villa plans
add a lift in Tilal Al Furjan

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing area: measured from the Nakheel villa plans and on site.
  • Unapproved works: older changes that would show in the Nakheel VSR are approved first.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Tilal Al Furjan
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Nakheel villa plans, if you have them

Who does what

The approval route in Tilal Al Furjan

Nakheel first, then Trakhees. Tilal Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides.—
Nakheel NOC
Nakheel
NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees.Nakheel extension fees
Permit
Trakhees
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Nakheel and Trakhees
Inspections during and after the works.—
Completion
Trakhees
Completion certificate that closes the permit; Nakheel updates its records.—

How it works

How it works in Tilal Al Furjan

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Nakheel villa plans, a site check, drawings and stamped calculations where needed.

We get it approved

Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.

What each work needs in Tilal Al Furjan

  • Extension: Nakheel NOC, Trakhees permit and stamped calculations
  • Wall removal: structural check, Nakheel NOC and Trakhees permit
  • Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
  • Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
  • External colour or façade: Nakheel NOC
  • Internal finishes only: usually no permit; check with Nakheel first

Questions

Questions owners ask in Tilal Al Furjan

Can I add a lift to my villa in Tilal Al Furjan?

Usually, yes, with a Nakheel NOC and a Trakhees permit, once an engineer has found a position that works with the structure.

My parent can’t use the stairs. What is the simplest option?

A home lift inside the villa or in a small external shaft, or a ground floor bedroom. We check the layout and structure and design the simplest workable option.

Does a lift need a pit?

Most home lifts need a shallow pit. We design it with the slab openings and supports.

Does an external lift shaft count as an extension?

An external shaft that adds enclosed floor area counts toward the allowance and the fees.

Who installs the lift?

A specialist lift supplier, to our structural design and the approved drawings.

Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality

Related guides

Keep reading