Tilal Al Furjan · Nakheel · Villa

Can I Build a Room on My Tilal Al Furjan Roof?

Can I Build a Room on My Tilal Al Furjan Roof? Sometimes. The roof slab and structure must carry it, and Nakheel reviews how it looks and the added area.

The short answer

A roof room on a villa in Tilal Al Furjan is reviewed carefully: the roof slab, columns and foundations must carry the new load, and Nakheel reviews the appearance from the street and the added floor area. If accepted, it needs a Nakheel NOC and a Trakhees permit with stamped calculations, and it counts toward the extension allowance.

Developer NOCNakheel online portal
AuthorityTrakhees
PlansNakheel provides villa plans
build a room on my Tilal Al Furjan roof

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing area: measured from the Nakheel villa plans and on site.
  • Unapproved works: older changes that would show in the Nakheel VSR are approved first.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Tilal Al Furjan
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Nakheel villa plans, if you have them

Who does what

The approval route in Tilal Al Furjan

Nakheel first, then Trakhees. Tilal Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides.—
Nakheel NOC
Nakheel
NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees.Nakheel extension fees
Permit
Trakhees
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Nakheel and Trakhees
Inspections during and after the works.—
Completion
Trakhees
Completion certificate that closes the permit; Nakheel updates its records.—

How it works

How it works in Tilal Al Furjan

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Nakheel villa plans, a site check, drawings and stamped calculations where needed.

We get it approved

Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.

What each work needs in Tilal Al Furjan

  • Extension: Nakheel NOC, Trakhees permit and stamped calculations
  • Wall removal: structural check, Nakheel NOC and Trakhees permit
  • Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
  • Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
  • External colour or façade: Nakheel NOC
  • Internal finishes only: usually no permit; check with Nakheel first

Questions

Questions owners ask in Tilal Al Furjan

Can I Build a Room on My Tilal Al Furjan Roof?

Sometimes. It depends on the structure and on Nakheel’s review of the appearance and added area. We check both before designing.

Can the roof carry a room?

Roof slabs are often designed for lighter loads. An engineer checks the slab, columns and foundations and designs strengthening if needed.

Does a roof room count as an extension?

Yes. It adds floor area and counts toward the allowance and the fees.

Can I put a pergola on the roof instead?

A roof pergola also needs the Nakheel NOC and a structural check, and Nakheel reviews its appearance.

What approvals are needed?

A Nakheel NOC and a Trakhees building permit.

Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality