Can I Build a Room on My Al Furjan Roof?
Sometimes. A roof room adds area and height, so Nakheel checks it against the height allowed and the look of the villa, and our engineers check the structure below.
Height and Look
The new room must match the villa style and stay within the height allowed.
What you need to know
- Structure: The roof slab, walls and foundations below are checked and calculations stamped.
- Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
- Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
- VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.
Documents you will need
- Title deed and owner Emirates ID or passport
- Villa plans from Nakheel, or as-built drawings
- Proposed drawings
- Stamped structural calculations for structural works
- Photos of the area
At a glance
Can I Build a Room on My Al Furjan Roof? at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| You and our engineers Step 1 | Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built. | — |
| Nakheel Step 2 | Reviews the design against its community rules and issues the NOC. | — |
| Trakhees Step 3 | Building permit for structural works. | — |
| Nakheel and Trakhees Step 4 | Inspections and completion. | — |
How it works
How It Works in Al Furjan
Your Idea, Photos and Plot Details
Villa Plans From Nakheel
Sketch and Early Check
Drawings and Structural Calculations
Nakheel NOC
Trakhees Permit, Works and Completion
Who does what
Three parties, one route
Nakheel
Master developer of Al Furjan. Issues the NOC; we apply as your consultant.
Nakheel approvals →Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →What Al Furjan Owners Ask Us About
- Roof Room
- Roof Terrace
- Stair Room
- Home Office
- Gym
- Storage
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Can I add a room on my Al Furjan roof?
Sometimes, within the height and style rules.
Who approves changes to my Al Furjan villa?
Nakheel issues the NOC, then Trakhees issues the building permit for structural works.
Do I need full drawings to ask if my idea is possible?
No. Photos and a simple sketch are enough for us to give you an early answer.
Can I get the plans of my villa?
Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.
Related guides
