Can I Open Up Walls Inside My Arabian Ranches Villa?

Yes, if the walls are not structural. To open up walls inside your Arabian Ranches villa, we first check which ones carry load.

Yes, if they are not structural. Emaar’s guide allows non-structural internal walls to be removed. If a wall carries load, the change needs a designed beam or support, stamped calculations, the Emaar NOC and the DDA permit. We use the as-built plans Emaar provides and check on site, so you know which walls can go before you plan your layout.

Non-structuralAllowed
Load-bearingCalculations and DDA
FirstCheck the plans and site

Emaar’s guide

Internal works the guide allows

These are allowed if they do not affect the structure or waterproofing. From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
FinishesFloor tiles, sanitary ware, internal painting and ceilings.
JoineryKitchen and bathroom cabinets, and wardrobes.
BathroomBathtub to shower, or the reverse.
WallsRemoving non-structural internal walls.
ServicesMinor electrical and plumbing works.
Contractor accessContractors still need an Emaar entry permit to work in the community.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Kitchens: Opening the kitchen to the living room is the common case.
  • Services: We check for pipes and cables in the wall.
  • Waterproofing: Must not be damaged.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Which walls can I remove?

Non-structural ones. We check the plans and the wall.

Do I need a permit?

Not for non-structural walls under the guide. Load-bearing changes need one.

Can I replace a wall with a beam?

Yes, with stamped calculations and approvals.

Do you come to the villa?

Yes.