Al Thanyah Fifth Plot Access NOC: Driveway, Gate and Kerb Cut Approval

A new driveway, second access, wider gate or kerb cut for a villa in Al Thanyah Fifth needs approval before any work at the road edge: RTA access design study, then the Nakheel plot access NOC and the RTA permits.

In Al Thanyah Fifth the access follows the Nakheel chain: the RTA access design study, the Nakheel plot access, curb cut and interlock NOC, the RTA construction NOC, then the sidewalk modification permit. Nakheel asks for the drawings as PDF plus AutoCAD in DLTM coordinates. The works are done as approved and the security deposit is refunded after they are accepted.

RouteRTA access design study, then the Nakheel plot access NOC and the RTA permits
DrawingsPDF and AutoCAD DLTM
Ends withDeposit refund

What you need to know

  • Survey: The frontage, kerb, poles and levels.
  • DLTM drawings: Access layout, kerb cut and interlock.
  • Light poles: Moved only with RTA approval.
  • Deposit: Refunded after the works are accepted.

Documents you will need

  • Title deed and owner ID
  • Affection plan
  • Site survey of the plot frontage
  • Access drawings in PDF and AutoCAD DLTM coordinates
  • Developer NOC where the community has a master developer

By community

Plot access route by community

We confirm the route for your plot.

CommunityApproval routeGuides
Al Barsha, Umm Suqeim
Dubai Municipality area
No developer NOC; RTA steps.Al Barsha and Umm Suqeim
Dubai Hills Estate
Emaar NOC, DDA
Then the RTA steps.Dubai Hills
Emirates Hills
Emaar NOC, DM
Then the RTA steps.Emirates Hills
Palm Jumeirah, JVC, Jumeirah Park
Nakheel plot access NOC
After the RTA access design study.Palm Jumeirah
JVC
Al Thanyah Fifth
Nakheel plot access NOC
Then the RTA steps.Al Thanyah Fifth

How it works

The plot access approval chain

1. Site survey

The frontage, kerb, footpath, poles and levels.

2. DLTM drawings

Access layout, kerb cut, interlock and levels in DLTM coordinates.

3. RTA access design study

The concept for the access.

4. Developer NOC

Plot access NOC where there is a master developer.

5. RTA construction NOC

For the works at the road edge.

6. Sidewalk modification permit

Kerb, footpath and interlock changes.

7. Works and deposit

Works done as approved, then the security deposit refund.

Who does what

Who approves a plot access

🛣️

RTA

Access design study, construction NOC and sidewalk modification permit for the works at the road edge.

RTA driveway NOC →
🏘️

Master developer (where applicable)

Plot access NOC in master communities, e.g. Nakheel or Emaar.

Developer NOC first →
📐

Structural Solutions

Site survey, DLTM access drawings and the applications.

Talk to our engineers →

Why plot access applications get returned

  • Drawings not in DLTM coordinates
  • No access design study
  • Access too close to a junction, pole or another access
  • Works started before the permits
  • Site levels or kerb not matching the drawings

Questions

Questions villa owners ask

Do I need approval for a new driveway in Al Thanyah Fifth?

Yes: RTA access design study, then the Nakheel plot access NOC and the RTA permits.

Can a light pole in the way be moved?

Often, with an RTA relocation approval.

Why did Nakheel return my drawings?

Often because they were not in AutoCAD DLTM coordinates.