Who Can Prepare As-Built Drawings in Dubai?

As-built drawings used for authority or developer submissions should be prepared by an engineering consultancy that can survey the property, draft to the required format and review the drawings for submission.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Why It Matters

Drawings submitted to DM, DDA, Trakhees or developers need to be accurate and in the right format. A consultancy can also assess structural elements and stamp the drawings where required.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What to Look For

On-site surveying, AutoCAD drafting to the authority’s format, engineer review, and experience with the developer or authority you are submitting to.

Situations We Help With

Villa Owners

Buyers & Sellers

Contractors

Building Management

Warehouse Owners

Tenants

Simple Approval Process

How Our Approval Process Works

We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.

Decorative line divider graphic

Quick Review

We review drawings and project requirements fast.

Plan Design

Our team prepares compliant
drawings and files.

Decorative line divider graphic

Easy Submit

We submit documents to
Dubai authorities safely.

Decorative line divider graphic

Final Permit

Receive approvals and
permits without delays.

Villa Drawings for Dubai Structural Calculations for Villa Modifications in Dubai Nakheel online services

Proven track record

Across Dubai

Established firm

Years of experience

Highly rated

By our clients

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Who Can Prepare As-Built Drawings in Dubai? — FAQs

Who can prepare as-built drawings in Dubai?

For submissions, an engineering consultancy that can survey, draft to format and review the drawings.

Can a draughtsman prepare them?

For submissions, drawings usually need consultant review.

Do drawings need a stamp?

Many submissions require a consultant stamp.

Do you prepare them?

Yes.

Do you cover all authorities?

DM, DDA, Trakhees and developer submissions.