As-Built vs Shop Drawings: What Is the Difference?

Shop drawings are prepared before or during construction to show how something will be made and installed. As-built drawings are prepared after construction to show what was actually built.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Shop Drawings

Prepared by contractors or fabricators — for steel, aluminium, joinery or MEP items — and approved before fabrication, so the work is built correctly.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

As-Built Drawings

Prepared after the work is complete, recording the final result including any changes made on site. They are used for completion, future applications and sales.

Situations We Help With

Steel & Aluminium Works

Fit-Outs

Pergolas & Shades

MEP Installations

Extensions

Completion Stage

As-Built vs Shop Drawings at a Glance

StepWhoWhat happens
1Structural engineerPrepares the fit-out drawings, structural checks and stamped calculations where needed.
2Landlord, building management or mallIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Civil Defence (DCD)Fire and life safety approval where required.
5Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, building management or mall NOC
  • Proposed layout and fit-out drawings
  • Structural calculations where loads or openings change

Key Technical Rules

  • Landlord or mall NOC: required before the authority submission.
  • Authority permit: from DM, DDA, Trakhees or the free zone, depending on the location.
  • Civil Defence: fire and life safety approval where the activity requires it.
  • Structural check: for new loads, openings or mezzanines.
  • Completion inspection: before the unit opens.
Villa Drawings for Dubai Emaar Extension Fees

Landlord NOC

First approval

Authority Permit

By location

Civil Defence

Where required

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

As-Built vs Shop Drawings: What Is the Difference? — FAQs

What is the difference between as-built and shop drawings?

Shop drawings show how something will be built; as-built drawings show what was built.

Who prepares shop drawings?

Contractors or fabricators, often stamped by a consultant.

When are as-built drawings prepared?

After construction is complete.

Do I need both?

Depending on the project, yes.

Do you prepare both?

We prepare as-built drawings and review or stamp shop drawings.