We prepare the architectural and structural as-built base, which your MEP contractor uses for the electrical layouts DEWA reviews.
As-Built Drawings for DEWA Dubai
DEWA applications — such as load changes, new connections or solar — often need drawings that show the property as it stands. We prepare as-built drawings that support your DEWA submission.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
When DEWA Needs Drawings
Adding load, extending the villa, installing solar panels or changing the use of a unit can all require updated drawings for DEWA, prepared with your MEP contractor.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Coordinated With Your MEP Contractor
Common Projects We Handle
Load Increase
Villa Extension
Solar Panels
Change of Use
New Connection
Restaurant Fit-Out
Simple Approval Process
How Our Approval Process Works
We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.
Quick Review
We review drawings and project requirements fast.
Plan Design
Our team prepares compliant
drawings and files.
Easy Submit
We submit documents to
Dubai authorities safely.
Final Permit
Receive approvals and
permits without delays.
Proven track record
Across Dubai
Established firm
Years of experience
Highly rated
By our clients
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
As-Built Drawings for DEWA Dubai — FAQs
Does DEWA need as-built drawings?
For some applications, updated drawings of the property are needed.
Who prepares electrical drawings?
Your MEP contractor, using our as-built base.
Is this needed for solar?
Solar applications commonly need drawings of the roof and building.
Do you survey on site?
Yes.
Can you coordinate with my contractor?
Yes.