Trakhees · CED

Outsourced Structural Engineer for Fit-Out Companies Dubai

If you're a fit-out company needing an outsourced structural engineer, you need reliable structural calculations for every project — here's how we support your business.

Why Fabricators & Contractors Choose Us

Every pergola, aluminium, or steel installation job needs consultant-stamped structural calculations before authority or community approval — we provide this as a repeat, reliable service for fit-out company needing an outsourced structural engineer across Dubai.

Developer NOCWhere the area has a master developer
Building permitTrakhees CED
Submitted byAn approved consultant

What you need to know

  • Why Partner With a Dedicated Consultant: Rather than sourcing a one-off consultant for each job, an ongoing partnership with a dedicated structural engineering team means clear coordination, consistent quality, and a single point of contact for your calculation needs.
  • Landlord or mall NOC: required before the authority submission.
  • Authority permit: from DM, DDA, Trakhees or the free zone, depending on the location.
  • Civil Defence: fire and life safety approval where the activity requires it.
  • Structural check: for new loads, openings or mezzanines.
  • Completion inspection: before the unit opens.

Documents you will need

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, building management or mall NOC
  • Proposed layout and fit-out drawings
  • Structural calculations where loads or openings change

At a glance

Outsourced Structural Engineer for Fit-Out Companies Dubai at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Prepares the fit-out drawings, structural checks and stamped calculations where needed.—
Landlord, building management or mall
Step 2
Issues the NOC for the works.—
Authority — Dubai Municipality, DDA or Trakhees — depending on the community
Step 3
Reviews the drawings and issues the permit.—
Civil Defence (DCD)
Step 4
Fire and life safety approval where required.—
Landlord and authority
Step 5
Completion inspection.—

How it works

Our B2B Service Process

Submit Project Specifications

Structural Calculation

Engineer Stamping

Complete Delivery

Ongoing Account Support

Repeat Project Turnaround

Who does what

Who does what

🏘️

Master developer

Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.

Trakhees communities →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Developer NOC missing
  • Unapproved works already on site
  • Missing owner documents

Questions

Questions owners ask

Do you offer volume pricing for repeat projects?

Yes — we offer preferential terms for contractors and fabricators with ongoing project volume.

Can you work directly with our client's submission timeline?

Yes — we coordinate directly to meet your project deadlines.

Do you provide a dedicated point of contact?

Yes — ongoing partners work with a consistent point of contact on our team.

How do we get started?

Contact us to discuss your typical project volume and requirements, and we'll set up an ongoing arrangement.

Related guides

Keep reading