Tilal Al Ghaf structural calculations: when you need them
Tilal Al Ghaf structural calculations: needed for extensions, garden suites, balcony enclosures, pools, roof works and to confirm a wall is non-structural before removal. We prepare and stamp them for the MAF NOC and the DDA permit.
Structural calculations in Tilal Al Ghaf are needed whenever works touch or load the structure: extensions and garden suites, balcony enclosure fixings and wind load, pools, solar frames on the roof, and wall removal, where the wall must be shown to be non-structural. They go with the structural drawings to DDA after the MAF NOC. We prepare and stamp them.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality
Works that need calculations
- Extensions: New structure and connection
- Garden suite: Foundations and frame
- Balcony enclosure: Fixings and wind load
- Pool: Pool shell and walls
- Roof works: Solar frames, loads
- Wall removal: Non-structural check
Documents you will need
- Title deed and owner ID
- Sub-community and home type
- Plans from your handover documents (or we survey)
- Photos
- Contractor trade licence copy
- Scope of work and drawings (we prepare these)
By work
Do I need calculations?
Based on the MAF Home Improvement Guidelines.
| Work | Approval route | Guides |
|---|---|---|
| Extension or garden suite Yes | Stamped for DDA. | — |
| Balcony enclosure Yes | Fixings and wind load. | — |
| Wall removal Wall check | Only non-structural walls. | Wall removal |
| Tiling, painting, wardrobes No | Minor works. | — |
How it works
How we prepare calculations
1. Photos
Send photos and your idea.
2. Check
Against the MAF Home Improvement Guidelines.
3. Drawings
Scope of work, drawings, calculations.
4. MAF NOC
We apply for you.
5. DDA permit
Building permit for major works.
6. Sign-off
Inspection, completion, deposit back.
Other questions Tilal Al Ghaf owners ask
Common comments on calculations
- No existing structure data
- Connection to the villa not shown
- Wind load missing
- Not stamped
Need calculations?
Send your drawings or photos.
Send us three things on WhatsApp:
- What the works are
- Any structural drawings you have
- Your sub-community and villa type
We prepare and stamp the calculations for DDA.
Questions
Tilal Al Ghaf structural calculation questions
When do I need structural calculations in Tilal Al Ghaf?
For works that touch or load the structure: extensions, garden suites, balcony enclosures (fixings and wind load), pools, roof works such as solar frames, and checking that a wall is non-structural before removal.
Do I need calculations for a villa extension?
Yes. The extension and its connection to the existing structure need structural drawings and stamped calculations for DDA.
Do wall removals need structural calculations?
The wall must be confirmed as non-structural, because structural walls cannot be changed under the MAF guidelines. We check the wall and document it.
Do pergolas need calculations?
The MAF guidelines set the size and position. Fixing and foundation details are shown in the drawings; larger or fixed structures may need calculations for DDA.
Do solar panels need a roof check?
The roof must carry the panels and frames. We check the load and fixings.
Who prepares and stamps the calculations?
A structural engineer with the consultant submitting to DDA. We prepare and stamp them as part of the submission.
What do you need for the calculations?
The existing structural drawings from handover, or a survey, plus photos and the proposed works.
How much does it cost?
It depends on the scope of the calculations. MAF charges its own application fee and holds a refundable deposit, confirmed when you apply. Send us the details and we review and advise on our fee.
What do you need from me to start?
Photos, your title deed, the sub-community and home type, and any plans from your handover documents. We tell you what the MAF Home Improvement Guidelines allow and what is needed.
Related guides
