Nakheel mall fit-out approval and consultant stamp.

Consultant-stamped drawings, the mall approval, the Trakhees permit and DCD approval for shops, restaurants and retail units at Nakheel malls. For fit-out contractors, tenants and brands.

Who approves fit-outs at Nakheel malls?

Fit-outs in Nakheel malls need the mall's approval, then the Trakhees permit, then Dubai Civil Defence (DCD) approval. Structural Solutions prepares and stamps the architectural partition, ceiling, MEP and fire safety drawings as consultant, gets the mall approval, applies for the Trakhees permit and submits to DCD. DCD then inspects the unit and issues the completion certificate before it opens. We work for the fit-out contractor, the tenant or the brand.

Step 1Mall approval with stamped drawings
Step 2Trakhees permit, then DCD approval
Before openingDCD final inspection and completion

Need the stamp?

Upload your fit-out drawings and trade licence. We stamp them as consultant and initiate the mall, authority and DCD approvals on your behalf.

Request a mall fit-out stamp →

What the mall asks for

  • Consultant stamp: Drawings stamped by a consultant, not by the fit-out contractor.
  • Drawings: Architectural partitions and ceilings, MEP and fire safety.
  • Fire safety: Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.
  • Food outlets: If LPG or gas is used, the approved LPG or gas provider needs its own approval; with electric cooking, an undertaking letter is submitted to DCD instead.

Documents for the submission

  • Trade licence and tenancy contract (lease or Ejari)
  • Unit plan and the mall or landlord fit-out requirements
  • Fit-out drawings: partitions, ceilings and finishes
  • MEP and fire safety drawings
  • Fit-out contractor details

Who does what

The approval route at Nakheel malls

We handle each step as consultant.

StepApproval routeGuides
Drawings and stamp
Structural Solutions (consultant)
Architectural partition and ceiling drawings, MEP and fire safety drawings, stamped as consultant.Which drawings?
Mall approval
Nakheel community management
The mall reviews the stamped drawings and approves the fit-out.Mall or authority?
Authority permit
Consultant → Trakhees
The Trakhees permit for the fit-out, after the mall approval.Trakhees approval
DCD approval
Structural Solutions → Dubai Civil Defence
Fire and life safety approval. We submit to DCD as consultant.DCD for mall fit-outs
LPG or gas (food outlets)
Approved LPG or gas provider
If LPG or gas is used, the approved LPG or gas provider needs its own approval; with electric cooking, an undertaking letter is submitted to DCD instead.LPG approval
Final inspection and completion
DCD and the mall
DCD final inspection and completion certificate before the unit opens.What DCD checks

How it works

From drawings to opening

Send us the requirements

The unit plan and the mall's fit-out requirements, from you or your contractor.

Drawings and stamp

We prepare and stamp the partition, ceiling, MEP and fire safety drawings.

Mall approval

We submit to Nakheel community management and answer any comments.

Authority permit

We apply for the Trakhees permit as consultant.

DCD approval

We submit the fire and life safety drawings to DCD.

Final inspection

DCD inspects the unit and issues the completion certificate before opening.

Who we work for

Contractors, tenants and brands

🛠️

Fit-out contractors

We prepare and stamp your drawings as consultant, so the mall and DCD accept your submission.

Why the mall asks for a stamp →
🏬

Tenants

We handle the approvals for your unit, whoever builds it.

Tenant or contractor? →
🏷️

Brands and retailers

One consultant for every store in your roll-out, mall by mall.

Brand roll-outs →

Why mall submissions get delayed

  • Drawings without a consultant stamp
  • Partition or ceiling changes not shown on the drawings
  • Missing fire safety drawings
  • No LPG approval or undertaking for a food outlet
  • Works started before the approvals
  • Drawings that do not match the site

Questions

Nakheel malls fit-out FAQs

Who approves fit-outs at Nakheel malls?

Fit-outs at Nakheel malls need the mall's approval, then the Trakhees permit, then Dubai Civil Defence (DCD) approval. Structural Solutions prepares and stamps the architectural partition, ceiling, MEP and fire safety drawings as consultant, gets the mall approval, applies for the Trakhees permit and submits to DCD. DCD then inspects the unit and issues the completion certificate before it opens. We work for the fit-out contractor, the tenant or the brand.

Can the fit-out contractor stamp the drawings?

No. The mall asks for a consultant stamp. We stamp the drawings as consultant and work alongside your contractor.

Is DCD approval needed?

Yes. Every commercial fit-out change, including partitions, ceilings and any decoration update, needs Dubai Civil Defence (DCD) approval, a DCD final inspection and a completion certificate before the unit opens.

Who can appoint Structural Solutions?

The fit-out contractor, the tenant or the brand. We handle the stamp and approvals for whoever appoints us.

What about LPG or gas?

If LPG or gas is used, the approved LPG or gas provider needs its own approval; with electric cooking, an undertaking letter is submitted to DCD instead.