Arabian Ranches · Emaar

Arabian Ranches Villa Types and Extension Guide

Arabian Ranches villa types vary by cluster, and Emaar reviews each extension for the specific villa.

Arabian Ranches has independent villas, attached and semi-attached units, and luxury and executive villas across Arabian Ranches 1, 2 and 3. Emaar’s guide sets one set of rules for villas and another for townhouses. What can be added depends on the villa or townhouse and on Emaar’s review, so we advise on each case. Your villa’s GFA comes from the as-built plans Emaar provides.

VillasDepends on your villa
Larger villasEmaar reviews each case
TownhousesEmaar reviews each case

Emaar’s guide

What Emaar looks at for an extension

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
WhereDepends on your plot and the affection plan setbacks. Emaar reviews each case, so ask us and we will advise on your villa.
First floorDepends on the villa. Emaar reviews each case, so ask us and we will advise on your villa.
FrontMust not go beyond the building line.
HeightCeiling at least 2.7 m. The extension height matches the first-floor slab.
LookSame theme, materials, openings, doors, windows and colours as the villa.
Not allowedGlass-enclosed, sandwich-panel and wooden extensions.
SizeThere is no single figure. Emaar reviews each case, so ask us and we will advise on your villa.
GFA excludesCarports, patios, verandas, terraces and the roof AC enclosure.
StructureWorks must not damage or demolish structural elements.

Emaar’s guide

Arabian Ranches townhouse modification rules

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
ExtensionDepends on the unit and plot. Emaar reviews each case, and a neighbour NOC may be needed. Ask us and we will advise.
Front and sideAsk us: Emaar reviews each case.
Service blockEnd and corner units only, in the side alley, not on the shared wall. Not allowed on middle units.
LookSame finishes, materials, sills and lintel levels. The elevation does not change.
Patio and main doorEnclosing the patio or moving the door onto an existing slab is reviewed as added area.
CarportStays parking. No roll-up doors and no extra parking.
Cat laddersNot allowed.
RateAED 1,000 per sq ft of added GFA, subject to Emaar review.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Corner and end plots: Often larger, so more room within the setbacks.
  • Luxury and Executive villas: The only villas where new access points can be allowed.
  • Middle townhouses: No service blocks.
  • GFA: Excludes carports, patios, verandas, terraces and the roof AC enclosure.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Do the rules change by villa type in Arabian Ranches?

Yes, Emaar treats villas and townhouses separately and reviews each case.

How do I find my villa’s GFA?

From the as-built plans Emaar provides, which we check on site.

Are Arabian Ranches 1, 2 and 3 different?

The route and the guide are the same: Emaar NOC, then the DDA permit.

Can I build on the roof of a Hattan villa?

It depends on the villa. Emaar reviews each case, so ask us and we will advise on your villa.