The Lakes Villa Types and Extension Guide
The Lakes villa types and extension guide: The Lakes has six sub-communities, and how much you can extend depends on your villa’s existing floor area, measured from the Emaar as-built plans.
The Lakes, part of Emirates Living, has six sub-communities: Deema, Forat, Ghadeer, Hattan, Maeen and Zulal. Villa layouts and sizes vary across them, so we don’t rely on generic type figures; we measure your villa’s existing floor area from the Emaar as-built plans and on site. Villas in The Lakes can usually extend by around 10% of the existing floor area, and going beyond 10% is possible, subject to Emaar Community Management approval. It depends on the villa and the plot.


What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing floor area: measured from the as-built plans, so the extension allowance is right.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in The Lakes
- Title deed and owner ID
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Who does what
The approval route in The Lakes
The Lakes is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | — |
| Emaar NOC Emaar Community Management | NOC. Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Municipality | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Emaar and Dubai Municipality | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Municipality | Completion certificate that closes the permit; Emaar then closes its file. | — |
How it works
How it works in The Lakes
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Emaar as-built plans, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Municipality permit where the works are structural.
Guides for works in The Lakes
- Villa modification guide
- Villa extension NOC
- Can I extend my villa?
- How much bigger can my villa be?
- Open up walls (living, dining, kitchen)
- Close my balcony
- Pergola or car shade
- Swimming pool
- Garage conversion
- Maid room
- Add a bedroom
- Villa lift
- Solar panels
- Structural calculations
- Case: column removed, then rebuilt
- Selling with unapproved changes
What each work needs in The Lakes
- Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Municipality permit
- Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
- Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
- External colour or façade: Emaar NOC
- Internal finishes only: usually no permit; check with Emaar first
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions
Questions owners ask in The Lakes
Which sub-communities are in The Lakes?
Deema, Forat, Ghadeer, Hattan, Maeen and Zulal.
Are all Lakes villas the same?
No. Layouts and sizes vary, so each villa is measured from its as-built plans.
How much can I extend?
Villas in The Lakes can usually extend by around 10% of the existing floor area, and going beyond 10% is possible, subject to Emaar Community Management approval. It depends on the villa and the plot.
How is my villa’s area measured?
From the Emaar as-built plans and a site check.
Is the approval route the same in every sub-community?
Yes. Across The Lakes: Emaar NOC, then Dubai Municipality.
Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA