Arabian Ranches Maid Room Extension NOC: Size and Location Rules

An Arabian Ranches maid room extension NOC comes from Emaar. The room goes in the side alley, 3 m from the villa or as the affection plan allows.

A maid or driver room in Arabian Ranches is built inside the plot, in the side alley, with an offset of 3 m from the villa or as the affection plan allows. It must be an independent structure that does not use the shared boundary wall, and it adds GFA. The minimum room size is 6.5 m² and 2.13 m wide, and the bathroom 2.79 m² and 1.22 m wide. It needs an Emaar NOC, then a DDA permit with stamped calculations. On townhouses, it is possible only on end and corner units.

Room6.5 m², 2.13 m wide
Bathroom2.79 m², 1.22 m wide
LimitReviewed as added GFA

Emaar’s guide

Maid room and driver room rules in Arabian Ranches

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
WhereInside the plot, in the side alley. Not in front of the building.
Offset3 m from the villa, or as the affection plan allows.
Boundary wallMust not use the shared boundary wall: the room is an independent structure.
Added GFAYes, it is reviewed as added GFA, and Emaar charges on the added area.
Room sizeAt least 6.5 m² and 2.13 m wide, with a ceiling of at least 2.7 m.
BathroomAt least 2.79 m² and 1.22 m wide.
OpeningsDoor and window match the villa. Windows and the bathroom exhaust face inside the villa.
FoundationsMust not disturb the villa or boundary wall foundations.
ACVillas: no AC on the room’s roof, and units hidden from neighbours and the street. Townhouses: on the roof only, hidden by a parapet or louvres.
TownhousesEnd and corner units only. Not allowed on middle units.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Fee: Emaar charges on the added GFA, from AED 1,000 per sq ft.
  • Foundations: Must not disturb the villa or boundary wall foundations.
  • AC on villas: Not on the room’s roof, and hidden from neighbours and the street.
  • Ceiling: At least 2.7 m.
  • Front of the villa: Service blocks are not allowed there.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Where can I build a maid room in Arabian Ranches?

Inside the plot in the side alley, not in front of the villa and not on the shared boundary wall.

What is the minimum maid room size?

6.5 m² and 2.13 m wide, plus a bathroom of at least 2.79 m² and 1.22 m wide.

Does a maid room add GFA?

Yes, it is reviewed as added GFA, and Emaar charges on the added area.

Can a townhouse have a maid room?

Only on end and corner units, not middle units.

Who approves it?

Emaar issues the NOC, then DDA the permit.