Arabian Ranches · Emaar

Can I Build a Garden Room in Arabian Ranches?

It depends on the type. In Arabian Ranches a pool house can go in the back garden, a shed must be lightweight, and a maid room goes in the side alley.

It depends on what you mean by a garden room. A pool house is allowed in the back garden within the setbacks, or against the shared wall with a neighbour NOC, with the size reviewed by Emaar. A store room or shed must be lightweight wood, aluminium or PVC, at most 3 m x 3 m, no higher than the boundary wall, with no toilet. A maid or driver room goes in the side alley. Glass and sandwich-panel extensions are not allowed.

Pool houseSize reviewed by Emaar
Shed3 m x 3 m, lightweight
Maid roomSide alley

Emaar’s guide

Pool house, store room and garden shed rules

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
Pool houseIn the back garden within the setbacks, or against the shared boundary wall with a neighbour NOC. The size is reviewed by Emaar.
Shed materialsLightweight only: wood, aluminium or PVC, in the villa’s colour.
Shed sizeAt most 3 m x 3 m, and no higher than the boundary wall.
Shed locationWithin the building lines, without using the boundary walls.
Wet areasNo toilets or wet areas in a store room or shed.
Pump roomsNo taller than the boundary wall. In the front yard they must be underground.

Emaar’s guide

Maid room and driver room rules in Arabian Ranches

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
WhereInside the plot, in the side alley. Not in front of the building.
Offset3 m from the villa, or as the affection plan allows.
Boundary wallMust not use the shared boundary wall: the room is an independent structure.
Added GFAYes, it is reviewed as added GFA, and Emaar charges on the added area.
Room sizeAt least 6.5 m² and 2.13 m wide, with a ceiling of at least 2.7 m.
BathroomAt least 2.79 m² and 1.22 m wide.
OpeningsDoor and window match the villa. Windows and the bathroom exhaust face inside the villa.
FoundationsMust not disturb the villa or boundary wall foundations.
ACVillas: no AC on the room’s roof, and units hidden from neighbours and the street. Townhouses: on the roof only, hidden by a parapet or louvres.
TownhousesEnd and corner units only. Not allowed on middle units.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Gym or office: Treated as an extension if it is an attached or built room.
  • Independent units: Additions must not create a separate home.
  • Toilets: Not allowed in a shed.
  • Gazebo: Backyard only, open sides, up to 3 m.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Can I build a garden office?

As a lightweight shed within the size limit, or a built room under the extension rules.

Can a shed have a toilet?

No.

Can a pool house use the shared wall?

Yes, with a neighbour NOC.

Does a pool house add GFA?

Yes, and Emaar reviews its size.

Related guides

Keep reading