Dubai Hills Villa Modification NOC: The Complete Guide
A Dubai Hills villa modification NOC comes from Emaar. Structural works then need a DDA building permit. Here is what Emaar looks at for each type of work.
Modifying a villa in Dubai Hills Estate starts with an Emaar NOC. Structural works then need a building permit from DDA. Emaar provides the as-built plans, and our engineers prepare the drawings and stamped calculations. Extensions are reviewed case by case, so ask us and we will advise on your villa. For other works, the rules below are a guide, subject to Emaar’s review of each application.
Extensions
What Emaar looks at for an extension
There is no single figure for Dubai Hills. Emaar reviews each case, so ask us and we will advise on your villa.
| Item | What to expect |
|---|---|
| Size and location | Depends on your villa, your plot and Emaar’s review. |
| Look | Same theme, materials, openings and colours as the villa. |
| Structure | Works must not damage structural elements. Our engineers check this first. |
| Added GFA | Emaar charges on the added area. See the fee table. |
| Next step | Send us your villa type and idea, and we will advise on your case. |
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Emaar’s rules
Maid room and driver room rules in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Where | Inside the plot, in the side alley. Not in front of the building. |
| Offset | 3 m from the villa, or as the affection plan allows. |
| Boundary wall | Must not use the shared boundary wall: the room is an independent structure. |
| Room size | At least 6.5 m² and 2.13 m wide, with a ceiling of at least 2.7 m. |
| Bathroom | At least 2.79 m² and 1.22 m wide. |
| Openings | Door and window match the villa. Windows and the bathroom exhaust face inside the villa. |
| Foundations | Must not disturb the villa or boundary wall foundations. |
| AC | Villas: no AC on the room’s roof, and units hidden from neighbours and the street. Townhouses: on the roof only, hidden by a parapet or louvres. |
| Townhouses | End and corner units only. Not allowed on middle units. |
Emaar’s rules
Pool house, store room and garden shed rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Pool house | In the back garden within the setbacks, or against the shared boundary wall with a neighbour NOC. The size is reviewed by Emaar. |
| Shed materials | Lightweight only: wood, aluminium or PVC, in the villa’s colour. |
| Shed size | At most 3 m x 3 m, and no higher than the boundary wall. |
| Shed location | Within the building lines, without using the boundary walls. |
| Wet areas | No toilets or wet areas in a store room or shed. |
| Pump rooms | No taller than the boundary wall. In the front yard they must be underground. |
Emaar’s rules
Enclosure rules: patio, balcony, terrace and voids
Emaar reviews these as added area, and every application is subject to its review.
| Item | What to expect |
|---|---|
| Patio | Allowed if the external elevation does not change. On the front, keep the arch: windows and doors sit flush with its inner edge. |
| Courtyard | Only an open courtyard at G+1 level, within the building line, with a matching parapet. |
| Rear balcony with a roof | Can be closed with non-reflective glass, clear glass or block wall. |
| Rear balcony without a roof | Can be closed with a new concrete roof and a parapet level with the existing one, subject to approval. |
| Front balcony | Emaar reviews it case by case: ask us about your villa. |
| Inaccessible terrace | On the rear or side, it can become living space, matching the villa. |
| Main door | Can move only onto an existing slab, and must not block a window or vent. |
| Void or double-height space | Allowed with structural approval before works: independent columns, or bolted steel beams subject to Emaar and authority approval. |
Emaar’s rules
Garage, carport and car shade rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Change of use | Not allowed. Carports stay parking only, even when enclosed. |
| Side enclosures | Clear glass blocks, aluminium louvres, metal fences, dark timber trellis or fixed glass panels. |
| Garage roof | Must not be changed or enclosed. |
| Garage door | Folding rectangular panels, off-white or beige RAL 1013. |
| Interlock | Replaced at the same level and in the same colour. |
| Extra parking | A pergola or canopy in the front yard, at least 1.5 m from the boundary wall, at lintel beam height, without blocking the front view. |
| Colours | Canopy beige or white; pergola dark brown or wood finish. |
| Fabric shade | Front garden, for car parking only, at least 1.2 m from the plot boundary, subject to site conditions. |
| Townhouses | No change of use, no roll-up doors, no side enclosures on pergola carports, and no extra parking at the side or front. |
Emaar’s rules
Boundary wall, fence and gate rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Rear and side walls | Changes only where the yard is visible from common areas because of higher ground, or the wall faces a guard house. Needs Emaar approval and a neighbour NOC. |
| Height | Fence and gate no higher than the existing wall or 1.8 m, whichever is less. |
| Front fence | On top of the existing wall, up to 1.4 m or the front pillar height, whichever is greater. |
| Colours | Black, beige or dark brown, or dark timber. Simple designs only. |
| Gates | Open inwards and do not enter common areas. No new gate in the rear wall. |
| Privacy screening | Plants, or fencing with acrylic sheets. No other screening. |
| Townhouses | Rear changes only where higher common ground exposes the yard. Fences stay within the building line and no higher than the boundary wall. |
Emaar’s rules
Door and window rules in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Like for like | Existing doors can be replaced with the same specification and colour. |
| Widening | Ground floor only, in a non-structural wall. At least 0.3 m of blockwork stays at each end. |
| Door opening | 0.9 m at most. |
| Not allowed | Changes to first-floor windows and ground-floor front windows. |
| Allowed | Ground-floor side and rear windows, in non-structural walls. |
| Two openings | Two doors or windows split by a small non-structural wall can become one sliding door or window. |
| Finish | Same material, colour and design as the villa. |
| Townhouses | New openings on side walls only, with enough setback. A sliding door can widen by at most 0.3 m each side. |
Emaar’s rules
Solar panel rules in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Location | On the roof only. |
| Height | Below the parapet wall, and not visible from common areas, streets or neighbours. |
| Panels | Non-reflective. |
| Wiring | Wiring and conduits hidden from view. |
Emaar’s rules
Colour and external finish rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Paint | Colours must match the Emaar approved palette. |
| Textured walls | Kept in their original state: no new textures and no colour change. |
| Additions | Anything attached to or detached from the villa matches its colour. |
| Cat ladders | Villas: allowed for roof maintenance, matching the villa’s colour. Townhouses: not allowed. |
| Lighting | Not mounted on boundary walls, and not aimed at neighbours’ windows. |
Emaar’s rules
Swimming pool rules in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Distance | Pool edge at least 1.5 m from the boundary wall and the villa, unless supporting engineering details are provided. |
| Jacuzzi or children’s pool | Up to 0.8 m deep: can be 0.6 m from the boundary wall, subject to authority approval. |
| Location | Must allow for all services and utility corridors. |
| Surroundings | Non-slip, durable paving, and child-safe access. |
| Filling a pool in | Remove at least the top 0.45 m of the shell and leave a drainage hole at the base. |
| Water features | Rear features no higher than the boundary wall; front features up to 1.2 m. |
Emaar’s rules
Pergola, gazebo and shade sizes: villa vs townhouse
Emaar reviews every application, so these are subject to its review.
| Item | Villa | Townhouse |
|---|---|---|
| Pergola: from the boundary | 1.2 m | 0.6 m |
| Pergola: height | Up to 2.7 m from floor level. Attached: just above the lintel. Free-standing: up to 3 m | Free-standing up to 2.5 m. Attached up to 2.7 m |
| Pergola: area | 20 m² or 15% of the plot, whichever is less | 20 m² on standard plots |
| Pergola: finish | Wood finish, brown or white, open sides | Matches existing pergolas, open sides |
| Gazebo | Backyard only, 1.2 m from the boundary, up to 3 m | Backyard only, 0.6 m from the limits, up to 3 m, 20 m² on standard plots |
| Shade structure | 1.2 m from side and rear boundaries, up to 3 m, open | 0.6 m from side and rear boundaries, up to 3 m, open, not in front |
| Boundary walls | Shades cannot be fixed to them | Shades cannot be fixed to them |
Townhouses
Townhouse changes in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Extensions | Depends on the unit and plot. Emaar reviews each case, and a neighbour NOC may be needed. Ask us and we will advise. |
| Service block | End and corner units only, not on the shared wall. |
| Carport | Stays parking. No roll-up doors. |
| Cat ladders | Not allowed. |
| Rate | AED 1,000 per sq ft of added GFA, subject to Emaar review. |
Emaar’s rules
Internal works Emaar allows
These are allowed if they do not affect the structure or waterproofing. Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Finishes | Floor tiles, sanitary ware, internal painting and ceilings. |
| Joinery | Kitchen and bathroom cabinets, and wardrobes. |
| Bathroom | Bathtub to shower, or the reverse. |
| Walls | Removing non-structural internal walls. |
| Services | Minor electrical and plumbing works. |
| Contractor access | Contractors still need an Emaar entry permit to work in the community. |
Emaar’s rules
Garden and landscaping rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Paving and decking | Inside the plot, up to 0.3 m high. |
| Planters | Up to 0.6 m high, on the inner side of the boundary wall. |
| BBQ, wall features, open showers | Backyard only, below the boundary wall height, on their own wall. |
| Trees | At least 1.5 m from boundary walls. |
| Common areas | No planting, paving or lighting on footpaths and road verges. |
Emaar’s rules
Emaar’s document checklist for a villa or townhouse NOC
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Drawings | Detailed architectural drawings, existing and proposed. |
| Elevations | Existing and proposed. |
| Scope | A detailed scope of works. |
| Photos | External photos for external changes such as paint, garage door, gate or fence. |
| Licence | Copy of the contractor or consultant licence. |
| 3D | A coloured 3D concept drawing. |
| Affection plan | For independent villas. |
| Completion certificate | The villa’s Building Completion Certificate, for all requests except soft landscaping. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Extensions: Case by case: ask us about your villa.
- Garages: Stay parking; no change of use.
- Balcony closures: Emaar reviews them case by case.
- Interiors: Finishes and non-structural walls are allowed if the structure is not affected.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Do I need an Emaar NOC to modify my villa?
Yes for external and structural works,.
Who issues the permit?
DDA, after the Emaar NOC.
Can I convert my garage?
No, carports stay parking.
Can I extend?
It depends on your villa and Emaar’s review. Ask us and we will advise.
Do the same rules apply across Dubai Hills?
The route does. Emaar reviews each villa individually.
Related guides
