Emaar · Villa · Second floor

Adding a Second Floor to an Emaar Villa in Dubai

Building up on an Emaar villa: the structure, Emaar’s review and which authority issues the permit.

Adding a floor or first-floor rooms to an Emaar villa depends first on the structure: the columns, slabs and foundations must carry the new load, or be strengthened. Emaar then reviews the height, the look and the added floor area against the community guidelines; some communities allow it case by case, others rarely. You need the Emaar NOC and a building permit from the authority for your community. Emaar charges on the added GFA: villas AED 1,000 per sq ft up to 10%, AED 3,000 from 10% to 20% and AED 6,000 above 20%, everything above 10% subject to Emaar Management approval; townhouses a flat AED 1,000 per sq ft.

What we check first

  • Foundations: Capacity
  • Columns and slabs: Capacity
  • Height: Emaar review
  • Area: Added GFA
  • Look: From the street
  • Authority: By community

Documents you will need

  • Unit and plot number
  • Title deed and owner ID
  • Photos of the home and the area
  • A sketch or short description of the idea
  • Emaar plans, if you have them

Route

Which authority issues the permit

We confirm the route for your home.

CommunityApproval routeGuides
The Meadows, The Springs, The Lakes, Emirates Hills
Dubai Municipality
After the Emaar NOC.Emirates Living
Dubai Hills Estate, Arabian Ranches, The Valley
DDA
After the Emaar NOC.Dubai Hills
Arabian Ranches
Emaar South
Dubai South Authority + DCAA
After the Emaar NOC.Emaar South
Mira, Mira Oasis
Al Aryam, then DDA
Community route.—

How it works

How it works

1. Send us the idea

Unit number, photos and what you want.

2. Plans

From Emaar, checked on site.

3. Early check

Guidelines, area and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

Emaar review.

6. Permit

Then works and completion.

What causes problems

  • No structural check of the foundations
  • A height Emaar does not accept
  • Applying to the wrong authority

Home in Emaar?

Check your idea first

Send us three things on WhatsApp:

  1. Unit number
  2. Photos of the area
  3. What you want to do

We check the Emaar rules and the structure, then handle the Emaar NOC and the permit.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions

Can every Emaar villa take another floor?

No. It depends on the structure and the community guidelines.

Which authority issues the permit?

Dubai Municipality in Emirates Living, DDA in Dubai Hills, Arabian Ranches and The Valley, Dubai South Authority in Emaar South.

What does Emaar charge?

Villas AED 1,000 per sq ft up to 10%, higher bands subject to Emaar Management approval.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading