Emaar South · Approvals

Who Approves Works in Emaar South? Emaar, Dubai South Authority and DCAA

Emaar South is in Dubai South. Works need the Emaar NOC, then Dubai South Authority and DCAA, not DDA.

In Emaar South, the Emaar NOC comes first, then the Dubai South Authority permit and approval from the Dubai Civil Aviation Authority (DCAA), with Civil Defence where fire safety is affected. Emaar South is not under DDA. The consultant and the contractor must be registered with Dubai South Authority. After the works, Emaar and the authority inspect and the completion certificate is issued.

FirstEmaar NOC
PermitDubai South Authority
AlsoDCAA

What you need to know

  • Not DDA: Emaar South is under Dubai South Authority.
  • Not Dubai Municipality or Trakhees: Neither applies in Emaar South.
  • DCAA: Needed for projects in Dubai South.
  • Registered: Consultant and contractor registered with Dubai South Authority.

Documents you will need

  • Title deed and Emirates ID of the owner
  • Villa plans from Emaar, or as-built drawings
  • Drawings and stamped structural calculations for the works
  • Emaar NOC
  • Fire safety drawings where Civil Defence is involved

By type of works

Route by type of works

We confirm the route for your villa.

WorksApproval routeGuides
Extension or new room
Emaar NOC, Dubai South Authority, DCAA
Adds floor area.Extension
Wall removal or opening
Emaar NOC, Dubai South Authority, DCAA
Stamped calculations.Wall removal
Pool
Emaar NOC, Dubai South Authority, DCAA
Plus pool environmental NOC.Pool
Pergola or shade
Emaar NOC, then authority if structural
We confirm for your design.Pergola
Completion
Inspection and certificate
After the works.Completion

How it works

How we get your Emaar South approval

1. Idea and photos

Tell us what you want to change; photos and a sketch are enough to start.

2. Villa plans

Emaar can provide the plans; we check them against what is built.

3. Design

Drawings and stamped calculations for the works.

4. Emaar NOC

We apply for you.

5. Dubai South Authority and DCAA

The permit from Dubai South Authority and DCAA approval; we submit as a registered consultant.

6. Works and completion

A contractor registered with Dubai South Authority builds; inspections and the completion certificate follow.

Who does what

Who approves villa works in Emaar South

🏘️

Emaar

Gives the NOC and can provide the villa plans.

Emaar NOC →
🏛️

Dubai South Authority

Issues the permit for the works. Not DDA.

Dubai South Authority →
✈️

DCAA

Dubai Civil Aviation Authority approval, needed for projects in Dubai South.

DCAA approval →
🚒

Dubai Civil Defence

Approves fire safety where it is affected.

What we prepare

Why Emaar South submissions get returned

  • No Emaar NOC
  • Plans that do not match the villa as built
  • Structural works without stamped calculations
  • Submitted to DDA instead of Dubai South Authority
  • DCAA approval missing
  • Contractor not registered with Dubai South Authority

Questions

Questions Emaar South owners ask

Is Emaar South under DDA?

No. Emaar South is under Dubai South Authority.

Is Emaar South under Dubai Municipality or Trakhees?

No.

Do I need DCAA approval in Emaar South?

Yes.

What comes first?

The Emaar NOC.