Who Is Responsible for Road Damage During Access Works?
The applicant and the contractor carrying out the works are responsible for damage to the road, footpath, kerbs and services during access works, and for reinstating them to RTA standards.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Protecting Yourself
Use a contractor familiar with road reserve works, keep a compliant work zone, and record the existing condition before starting.
How We Get Your Plot Access Approved
01
Site Survey & Plot Limits (DLTM)
02
RTA Access Design Study
03
Developer Plot Access NOC
04
RTA Construction NOC
05
RTA Sidewalk Modification Permit
06
Works, Handover & Deposit Refund
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Linked to the Deposit
Projects We Handle
Kerb Damage
Footpath Damage
Road Surface
Utility Damage
Street Lighting
Irrigation
Who Is Responsible for Road Damage During Access Works? at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the road frontage and prepares drawings in DLTM coordinates for RTA. |
| 2 | Master developer (where applicable) | NOC for works in the community. |
| 3 | RTA | Reviews the drawings and issues the NOC or permit. |
| 4 | Service authorities | DEWA and telecom clearances where services are affected. |
| 5 | RTA | Inspection and reinstatement check after works. |
Documents Required
- Affection plan / site plan
- Owner or company documents
- Survey-based drawings in DLTM coordinates
- Developer NOC (in master-developer communities)
- Existing services information, where available
Key Technical Rules
- Approval before road works: any work in the road reserve needs RTA approval first.
- DLTM drawings: RTA reviews drawings in DLTM coordinates.
- Utility clearances: DEWA and telecom services are checked where they run under the works.
- Work zone safety: works follow RTA work zone traffic management rules.
- Reinstatement: the road, kerb and footpath are reinstated and inspected.
RTA Approval
Before road works
DLTM Drawings
Survey-based
Utility Clearances
Where needed
Why Owners Choose Structural Solutions
Full Access Approval Chain
RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.
DLTM Drawings From Site Survey
We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.
Fewer Returned Submissions
Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.
Get Your Plot Access Approved
Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.
Who Is Responsible for Road Damage During Access Works? — FAQs
Who pays for road damage?
The applicant and contractor responsible for the works.
Does damage affect the deposit?
Yes — works are inspected before refund.
Do you prepare the access drawings?
Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.
Can works start before all approvals?
No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.
Who handles the submissions?
We prepare the drawings and handle the RTA and developer submissions as your consultant.